恒大临时用电方案(1
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. 6.4.4.7 stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide.