- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
一建笔记(国外英文资料)
一建笔记(国外英文资料)
2014.7.2
To purge the medium
The nominal diameter is greater than or equal to 600 liquid gases.
The nominal diameter is less than 600 liquid clean
The nominal diameter is less than 600 gas clean. 06:48
Steam pipes to clean up.
No steam cleaning shall be used for non-thermal piping.
The general rules of purge
1, the pipeline pressure test is qualified, the construction unit organization blows the washing, the braiding plan.
Check pipe branches and hangers and not allow the equipment to be blown off.
3, valves in pipeline pressure test dont participate in the purge, purge valve to protect it, before the former does not install the orifice plate, flange connection purge of important valve, throttle valve, regulating valve, safety valve, instrument, welding, instrument should be flowing through the bypass valve fire off valve head seat family cases.
4, the sequence manager, the branch, the pipe.
Pipeline pressure test
1 \
1, the pipeline pressure test should be in heat treatment, nondestructive testing, after hydraulic or pneumatic test, cannot hydraulic can not do, do pressure reduces the design institute to agree. Brittle material does not do air pressure test.
Hydraulic pressure test
Clean water is the medium, and chlorine ion in water is less than 25ppm
2, the temperature is not lower than 5 °, higher than the corresponding transformation temperature of metal material, it is strictly prohibited to material test temperature close to brittle transition temperature.
The design pressure of steel or non-ferrous metal pipes is 1.5 times, not less than 0.4 Mp.
4, test pressure 10 minutes, descend to design pressure to stabilize 30 minutes, no leakage, no reduction.
No pressure handling.
Pressure test
Air or noble gases are non-toxic, non-flammable, and dry gases.
Pressure test was designed to design pressure 1.15 times.
Before the experiment, the experiment should be carried out in air, and the pressure was 0, 2 Mp
3, test pressure rose to 50%, check the prese
您可能关注的文档
最近下载
- 最新:2024湖北省医疗服务价格项目及医保支付目录(完整版) .pdf VIP
- 高标准农田建设项目 投标方案(技术方案).doc
- 【桂科版】《综合实践活动》五下 第6课《购物的学问有趣的购物体验》课件.pptx VIP
- 深刻领会二十届三中全会精神,进一步全面深化改革-2025执业药师继续教育答案.docx VIP
- m埋地钢管结构计算1.0.xls VIP
- VTE相关知识培训课件.pptx VIP
- 2025年 河南统招专升本 公共英语 真题及参考答案.pdf VIP
- 《肿瘤治疗相关心功能不全防治与管理专家共识》解读(2)(1).pptx VIP
- 为爱痴狂 钢琴独奏版 钢琴谱五线谱.pdf VIP
- 机床夹具拆装与调整实验实验报告模板.pdf VIP
原创力文档


文档评论(0)