HDPE土工膜主要施工方法(国外英文资料).docVIP

HDPE土工膜主要施工方法(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
HDPE土工膜主要施工方法(国外英文资料)

HDPE土工膜主要施工方法(国外英文资料) Main construction method of HDPE The requirements before construction 1 landfill anti-seepage construction is the core of the whole project, therefore, the construction must be under the supervision of party a, design, supervision together, under the close cooperation of the civil parties to complete. The materials used in the project must meet the requirements. The ground level of the construction must meet the design requirement. The equipment of material construction must meet the requirements. The builders must be skilled in the work. Third, control the requirement of laying the ground at the ground level: four degrees Level 1: plus or minus 2cm/m2, flat and straight; Compactness: 95 percent, which can be used to lay the earthen film on it. 3 longitudinal and horizontal slope: above 2%, the bottom of the landfills must be conducive to the flow of leachate. Cleanliness: the vertical depth of 2.50 cm is not allowed to have roots, debris, stones, concrete particles, etc. The construction of climate requirements: 1 the temperature of 5 to 40 ℃ advisable, given the geomembrane heat bilges cold shrink, according to experience, when the day is cold, the laying of geomembrane should some; When the weather is hot, relax; But be careful to avoid the heat in the middle of the summer. Wind and rain: wind above 4 or rainy days should be stopped. In the wind hour, it is appropriate to use the sandbag to hold down the earthen membrane. 5, HDPE mural construction installation 1 HDPE film construction installation process flowchart Cutting and shipping: According to the record of the laying of the base, the large sheaf of the earthen film, the number record, is carried to the laying site by number. Note that the earthwork film should not be dragged and dragged in the course of transportation. 3 HDPE mural installation installation 1) it should be extended from the bottom to the top, not too tight, and should be left over 1.50% of the rest, in case of parti

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档