- 13
- 0
- 约1.92万字
- 约 4页
- 2017-05-27 发布于河南
- 举报
绿化施工放线介绍(国外英文资料)
绿化施工放线介绍(国外英文资料)
The line is a very important step in the construction of the garden. Pay-off embodies the garden road, square, waters and other landscape elements of its shape and in the construction site layout, the following all the garden construction in accordance with it. Lines are composed of points, which are divided into lines and curves. Put a line segment is simpler, need to determine two points of straight line, can be sent out in a straight line, and for many points need to be sure to put curve especially irregular curve can be put away. How do you determine the points on the curve? It is more common to use AUTOCAD to grid the grid (quite a rectangular coordinate system) on the overall floor plan, and to form a grid map to guide the construction of the line. The landscaping technician determines the line by counting the grid and applying scale. Through the practice of construction, I find that there are many problems that can be solved by using this method. First, because using scale, there is a large margin of error in the line, and the data that different people read from the scale is often different. Second, due to the grid and landscape elements (such as a curve) garden road intersection of number often cannot meet the needs of the alignment accuracy, thereby, make the release curves were slippery. Thirdly, the amount of measurement on the construction site is very large. The author has found that the problem can be solved by using AUTOCAD.
Use AUTOCAD auxiliary pay-off general idea is: open the overall plan sketch in AUTOCAD, analyzing the characteristics of the graphics and the construction site, to do a line segment, auxiliary line segment is divided into several equal parts to do vertical section with gardens, such as garden road intersection line. So it is concluded that the number of intersections is at a point on the line in landscape architecture, and then use AUTOCAD annotation tool marked the length of the vertical section respectively. I
您可能关注的文档
最近下载
- 《影视视听语言》第四版 07189 第六、七、八、九章.pptx VIP
- 声带息肉手术患者护理查房.pptx VIP
- 《影视视听语言》第四版 07189第五章.pptx VIP
- 《影视视听语言》第四版 07189第三章.pptx VIP
- 《影视视听语言》第四版 07189 第一章课件.pptx VIP
- 高一地理自然地理环境的差异性.pptx VIP
- 《影视视听语言》第四版 07189 第二章.pptx VIP
- 2026年南宁职业技术学院单招职业适应性考试模拟测试卷附答案解析.docx VIP
- 高中地理 人教版 选修一《自然环境的整体性与差异性》自然环境的整体性 课件.pptx VIP
- 健康证考试题及答案.docx VIP
原创力文档

文档评论(0)