网站大量收购独家精品文档,联系QQ:2885784924

地铁对地质的影响1(国外英语资料).doc

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
地铁对地质的影响1(国外英语资料)

地铁对地质的影响1(国外英语资料) Guangzhou - the geological condition is very complicated, but the subway construction has worked out a set of mature experience. (data, pictures) Guangzhou Metro Corporation Vice President of an exclusive interview with this newspaper, self created shield law to solve geological problems Thematic co-ordinate new express reporter Zhang Yingzi Special executive new express reporter Xu Jing Guangzhous geology is so complex, how will it affect the subway network being built on a large scale? The safety of subway construction and operation is not safe? In this regard, said deputy general manager of Guangzhou Metro Company Chen Shaozhang an interview with this newspaper: Guangzhou is not suitable for the construction of the subway in Guangzhou in 1962 that long-standing, the first geological exploration report on this conclusion, not suitable for the construction of Metro Guangzhou geology. But he also said that more than 10 years, the Guangzhou Metro has found a more mature experience and response measures, the public need not worry. History Geological problems delayed the birth of the subway Chen told reporters, from the Guangzhou urban rail transit network planning process, in 1962, Guangzhou will have the first geological survey report. It has been pointed out in the report that the geological conditions in Guangzhou are characterized by the undulating topography and the complex lithology and diversity of the strata. The three major geological problems in Guangzhou are: one is the development of a number of Guangzhou subway line after the fault rifted, Guangcong fault, Shougouling fault more than 10. The biggest problem is the fracture zone surrounding rock crushing, relatively complete rock belongs to the weak interlayer, accidents caused by water inrush, engineering easily in tunnel construction; two is granite, mixed granite eluvial multi. When soaked in water, the soil will quickly soften and disintegrate and flow, causing water inrush and other

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档