- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
土建工程师要注意的30点(国外英语资料)
土建工程师要注意的30点(国外英文资料)
1 construction progress plan and the actual construction progress to complete contrast (monthly schedule and actual amount complete crossing figure, comparison), project lag reason
2 elevator chute fixed beam, foundation pit base determine the reserved hole position, and the equipment room elevator pager and fire alarm position size confirmation, elevator chute fixed beam, foundation base and equipment room reserved hole position should be on the first floor columns must be confirmed before the construction, to provide parameters shall prevail, elevator manufacturers can have local changes the original design parameters, avoid the waste of resources).
3 construction cranes elevation and horizontal and vertical transportation equipment foundation of confirmation (height will be subject to the landscape design elevation, horizontal position to avoid cable construction of hydropower thereof, avoid removing the late fees)
4 geothermal reserve concrete kitchen and toilet water pipe lines trough the up and down (pipeline and 20 cm from the wall in the concrete construction internal laid), facilitate future fine decoration hydropower pipeline construction requirements of local change.
5 the basement wall of casing waterproof processing, waterproof, fire pool fire riser, equipment, equipment foundation need civil engineering complete finished ahead of time, such as other late equipment installation, debugging time confirmed.
The construction of the construction holes of the masonry is reinforced, and the cracks are not created after the later renovations.
In the basement of all the equipment, the compaction of backfill soil should be strengthened and the concrete column should be considered in the design, so as to avoid the sinking after the installation of the equipment.
8 elevators all equipment (especially small component) on the construction of vertical transportation equipment dismantled before the roof room, avoid late manual handling of stair fa
您可能关注的文档
最近下载
- ABB 产品手册[ZH] CPX100系列控制与保护开关 安装使用手册 手册(中文).pdf
- 通力电梯样本.pdf VIP
- 皖2015Z102:海绵城市建设技术——雨水控制与利用工程.pdf VIP
- 高等学校物业服务费用测算规范.pdf VIP
- 职业院校教学能力比赛参赛教案模板.docx
- 《中国少年先锋队》主题队会课件.ppt VIP
- GJ B 1420B-2011 半导体集成电路外壳通用规范.pdf VIP
- 新人教版五年级音乐上册全册教案及教学进度计划-表格.doc VIP
- 中央安全生产考核巡查明查暗访主要检查内容问题清单.docx VIP
- 建设项目经济评价方法与参数第四版10503.pdf VIP
原创力文档


文档评论(0)