物料海上运输培训.ppt

  1. 1、本文档共20页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
物料海上运输培训

Attendee Requirement: COPC Service Supervisor, Warehouse Man, Material Man; COPC Crane Operator, Rigger, Signalman; COPC Drilling Supervisor; COSL Sr. Toolpusher, HSE, Material Man; Others who may involve in material back loading. Verification Requirement: The sign-on sheets of both hitches shall be approved by facility OIMs and the scan saved at facility S drive. Background Background_ Near Miss of overloading basket On Aug.5, offloading of Shengfeng #2 was stopped when harbor personnel suspected the basket was overweight. (12t gross) Personnel suspected there Were too many 4-1/2” tubing in the basket and unloaded it, one bundle at a time. (Same way it was back loaded to the SF #2 offshore) Calculated total weight was 24.8t gross. Logistics immediately reported condition to offshore for investigation. Cause Analysis: Poor planning and communication. Poor hazard awareness. Did not follow manifesting procedure. Corrective Action: Share near miss in whole field through September 8th, 2013. SWL of basket must be confirmed by lifting crew when back loading pieces. Facility materials man must calculate and record total weight of basket when back loading pieces to insure no over weight condition exists. Background_ Near Miss of overloading basket Aug 16_NM_WHPE_Drilling:Around 12:00PM, 3 bundles of tubing (60 joints) was back-loaded into the long basket on Guoshun-18, a reluctant acceptance by the vessel happened at last. Current Requirements: Background_ Non-compliance of backload cargo from offshore Jutal cage to Hua Teng from WHPA on Aug.28,2013 The wire sling is too short for rigging to crane. Requirements of COPC HSE MS Procedure Material Handling COPC HSE MS Procedure Material Handling 4.5 Offshore Material Handling Back Loading 4.5.1 Line supervision Ensure that the following requirements are performed before any material is back-loaded for transportation back to shore or to other facilities: Ensure all lifting equipment is in good c

文档评论(0)

shuwkb + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档