- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
英文合同模板 工区监理办公室板房合同
SUBCONTRACT AGREEMENT
PART ONE (1)
PART (1)
SPECIAL CONDITIONS
SC1 Subcontract Scope
SC1.1 The Subcontractor undertakes to manufacture, supply, deliver, install, handover and warrant at King Abdullah Project For Developing the Security Head Quarters (KAP 5), Portable Cabins for Consultant Site Offices as stated in the attached BOQ (Attachment No. 1) together with all relevant requirements (the Subcontract Works) all as required under the Main Contract between the Employer and the Contractor. The Subcontract Works shall be completed as per the Subcontract conditions, Contractor’s Employer’s instructions, free from all imperfections, hidden or apparent defects, as conditioned in the related specifications (Attachment No. 2) and as per the approved shop drawings and approved submittals. The Subcontract Works shall be executed and handed over, in a fully functional condition to the satisfaction and approval of the Contractor and the Employer.
SC1.2 The listing and or description of the Subcontract Works’ items in the Subcontract documents shall not be taken to limit the nature, range or extent of the Subcontractor’s obligations for satisfactory completion of the Subcontract Works, and any issue / matter / works included in any of the Subcontract documents is deemed to be included in the Subcontract works.
SC1.3 It is hereby understood and agreed that the Subcontract Agreement executed between the Contractor and the Subcontractor is purely on back to back basis with respect to the scope of the temporary Fencing Works included in the Main Contract executed between the Employer and the Contractor. Accordingly, the Subcontractor shall have the same obligations towards the Contractor for the Subcontract Works under this Agreement as the Contractor has for the same towards the Employer under the Main Contract, and the Subcontractor shall assume and perform all of the Contractor’s obligations in relation to the Subcontract Works to the entire satisfaction and approval of
您可能关注的文档
最近下载
- 译林版英语五年级上册复习课件(语法知识含部分练习).ppt VIP
- Siemens西门子家电iQ300 滚筒洗衣机 9 kg 1200 转 分钟 WB24UMZ01W 使用 安装指南_2.pdf
- 子网掩码与子网的划分.ppt VIP
- 安徽多层商业建筑工程项目冬季施工方案.doc VIP
- 潜在失效模式及后果分析(DFMEA).xls VIP
- 矿建工程监理月报.doc VIP
- 手术患者深静脉血栓的预防.pptx VIP
- 最新国学《弟子规》ppt精品课件.pptx VIP
- 从村寺_祠堂看宗族对土族乡村社会_省略_制_基于景阳镇李氏土族的田野调查_张兴.pdf VIP
- 《金融经济学二十五讲》课后习题及答案.pdf VIP
原创力文档


文档评论(0)