- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
三种生产类型比较(Comparison of three types of production)
三种生产类型比较(Comparison of three types of production)
A brief analysis of ATO, MTO and ETO
The author:
An ERP industry veteran, from nearly 20 years, from the consultant do senior consulting and implementation services director, participate in or responsible for the implementation of dozens of project implementation, until now still continue to engaged in professional work, for manufacturing more study and understand.
Logic analysis, ETO model can better meet the requirements of customers special custom, but ETO mode, manufacturing companies often exist a large number of one-time items, new items and new version of the BOM, new processes, etc., and in the sales quotation, project design, planning, production coordination, supply security is more complicated than the ATO and MTO.
When we talk about manufacturing, we often talk about ATO, MTO and ETO. When it comes to complex manufacturing, these concepts are more likely to be mentioned. In fact, these concepts refer to a production-driven approach. Some manufacturing enterprise is according to predict or market demand and production plan, and then produce the products according to the plan, and sales of the products as much as possible to go out, this way is called MTS (Make to Stock), namely for Stock production. Is, of course, there are also some manufacturing enterprise can't do this, because its product is produced according to customer's request to, before did not know the requirements of customers can't produce the final product, or face the consequences of the biggest is likely to be sales out, this type of enterprises can be referred to as "made to Order", and depending on the situation, and it can be divided into the ATO (Assemble to Order, Order for assembly), MTO (Make to Order, Order oriented production), ETO (Engineering to Order, according to the Order design). In the face of these several ways to do a rough analysis comparison.
1. ATO (Assemble to Order)
First, it is a production model that better meets cu
您可能关注的文档
- 153机器技巧(153 machine skills).doc
- 15加速度(15 the acceleration).doc
- 15 速度变化快慢的描述—加速度2(Description of the change of speed of 15 - acceleration 2).doc
- 15春西交《工程结构抗震》在线作业满分答案(15 spring xixi engineering structure earthquake seismic online work out of perfect answer).doc
- 15春西交《弹性力学》在线作业满分答案(15 spring xixi elastic mechanics online work perfect answer).doc
- 15春西交《锅炉运行》在线作业 满分答案(The boiler running online work of boiler run is full of perfect answers).doc
- 16-弗莱雷解放教育思想视角下数学新课程(16 - frei liberated education from the perspective of new mathematics).doc
- 16道嵌入式C语言面试题(16 embedded C language interview questions).doc
- 17-核安全与保障(17 - nuclear safety and security).doc
- 18-杂化轨道理论(18 - hybrid orbital theory).doc
- 建设项目可行性报告 建设项目可行性报告不能作为向银行申请贷款的依据 (20篇).docx
- 领导辞职报告范文 领导怎样写辞职报告书 (21篇).docx
- 工程项目可行性研究 工程项目可行性研究报告 (16篇).docx
- 初中班级工作总结 初中班级工作总结怎么写 (15篇).docx
- 年终工作总结报告 年终工作总结报告ppt (15篇).docx
- 大学生活规划书 大学生活规划书怎么写 (19篇).docx
- 小学六一儿童节活动方案 小学六一儿童节活动方案策划新颖 (21篇).docx
- 房地产营销策略 房地产营销策略包含哪几个方面 (18篇).docx
- 实验室相关主体安全责任清单 .docx
- 实验安全事故应急预案(试行).pdf
文档评论(0)