- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
水电质量通病(The quality of water and electricity is very ill)
水电质量通病(The quality of water and electricity is very ill)
(8) the quality of the stent installation:
The bracket is not strong: because the hole is not deep enough, the card has no tail or cut off, and the inside of the card hole is not cleaned, and the water is not fixed.
2. Improper selection of pipe supports: after the pipe has been put into use, the stent will not work, causing the deformation of the pipe to be damaged, which will seriously affect the use.
The installation spacing of the pipe supports is too large and the elevation is not allowed. After the pipe is put into use, the pipe is partially collapsed, and the elevation is not allowed, which seriously affects the use of the pipe.
It is difficult to guarantee the stability, straightness and slope of the system.
3. Product protection:
(1) the fixed cement mortar shall not be heavy when it is not reached, so as not to cause the stent to loosen.
(2) after the stent is installed, if there are other engineering operations to cope with its protection.
(3) when installing the pipe, the support should not be hit.
(4) it cannot be used as a fixed point for other bearing.
(6) irrigation test
Irrigation test shall be carried out for buried pipe, pipe well inner riser, horizontal branch in the ceiling, and pipes with nodules required before concealment.
The irrigation height should not be lower than the upper edge or lower ground level of the lower sanitary appliance, and after the irrigation, the irrigation water will be filled for 5min, the liquid surface will not drop, the pipe and the interface will not leak.
Toilet tube filling water test, if each layer need to be closed water test, gasbag placed has two ways: one is installed while, a layer of horizontal drainage pipe installation is complete, from tee to jilt mouth put down the bag; One is the final unification, the layer has the inspection port, the air bag is installed above the inspection mouth; The airbag, which has no inspection port, takes out a 5m long
您可能关注的文档
- 工业级聚合氯化铝1(Industrial grade polymerization of aluminum chloride 1).doc
- 工商专业个人与团队管理试题(Business professional and team management test).doc
- 工商管理中的全信息原则与信息开发(The whole information principle and information development in business administration).doc
- 工程事故分析与处理资料1(Engineering accident analysis and processing data 1).doc
- 工程建设法规相关的民商事法律制度(The legal system of civil and commercial affairs relating to the construction and construction of the project).doc
- 工程塑料聚酰胺尼龙资料(Engineering plastic polyamide nylon material).doc
- 工程材料.(Engineering materials.).doc
- 工程材料及其成形技术基础(Foundation of engineering materials and forming technology).doc
- 工程测量期末考试模拟试卷二(附带答案)(Project measurement final exam paper 2 (with answers)).doc
- 工程部门管理制度(Engineering department management system).doc
最近下载
- 九年级中考英语动词复习课件(共33张PPT).pptx VIP
- AI技术提升中职数学教学质量的策略.docx
- 2022年9月全国事业单位联考《综合应用能力》A类真题及参考答案及解析.pdf VIP
- 2025年执业药师之西药学专业一模考预测题库(夺冠系列).docx VIP
- ISO 15614-13 2023 金属材料焊接工艺规程及评定 电阻对焊和闪光焊(中文版).pdf
- 过敏性休克抢救指南2025版.docx
- 扩张型心肌病的护理查房课件.pptx VIP
- 第一章 食品工艺学导论.ppt VIP
- 系统性红斑狼疮(共44张PPT).pptx VIP
- 3.1 标志设计 (课件)人教版七年级美术上册.pptx VIP
文档评论(0)