建筑工程查验收交屋办法(Measures for checking and acceptance of construction projects).docVIP

  • 2
  • 0
  • 约1.85万字
  • 约 15页
  • 2017-07-22 发布于河南
  • 举报

建筑工程查验收交屋办法(Measures for checking and acceptance of construction projects).doc

建筑工程查验收交屋办法(Measures for checking and acceptance of construction projects)

建筑工程查验收交屋办法(Measures for checking and acceptance of construction projects) Construction engineering inspection and acceptance to house the way The - General Article 1 These measures are hereby formulated for the purpose of fulfilling the construction according to the plan and delivering the house on time, improving the construction level and ensuring the credibility of the company. The Second related projects where the companys inspection and acceptance, housing matters subject to follow these measures for. The Engineering inspection. Third, the inspection of various projects are divided into three categories: reinforcement inspection, key inspection and spot check. The (a) the inspection and reinforcement Fourth kinds of reinforcement engineering construction site inspection personnel should be two days prior to the pouring of concrete filling to the building authority reported, and accept the supervision of the inspection (inspection by the architect or design KEPAI technician). For the purposes of the works, they may continue construction if they are to be used by the public and shall be checked by the competent construction authority. (in accordance with the provisions of article fifty-seventh of the law building) Fifth after receiving the construction license or miscellaneous license from the date within three months before the start of construction, and should be in conjunction with the constructor and supervisor who will start date together with the name, address and name certificate for the competent authorities of construction (Public Works Department or bureau) for reference, because it can not be started in the preceding period, shall state the reasons for an extension. But the extension may not exceed three months, the overdue license is invalid. (in accordance with the provisions of article fifty-fourth of the law building) Sixth, when reporting, should pay attention to whether the license is more than the commencement or completion of the period, if ov

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档