2010年咨询师《工程项目组织与管理》考点采分(Consultants in 2010 project organization and management test points).docVIP

2010年咨询师《工程项目组织与管理》考点采分(Consultants in 2010 project organization and management test points).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2010年咨询师《工程项目组织与管理》考点采分(Consultants in 2010 project organization and management test points)

2010年咨询师《工程项目组织与管理》考点采分(Consultants in 2010 project organization and management test points) Consultants in 2010 project organization and management test points 1, in the various stages of the project and the construction period of the project, to a great extent, determine the success or failure of the implementation of the project and the high efficiency to achieve the desired goal stage is. A. project planning and decision making phase B. project preparation phase C. project implementation phase D. project completion acceptance and summary evaluation phase 2, for the production operations department, the requirements and expectations of the project is (). A. specifications clearly, from orders to delivery time enrichment B. timely requests for services, to minimize interference with the construction of the project C. loan security is paid on a predetermined date and the project can provide full repayment of the debt D. according to quality requirements, on time or ahead of the formation of comprehensive production capacity, can guarantee normal operation 3, ISO and FIDIC recommend using the international general PDCA (Plan-Do-Check-Act) cycle method. Which of the following is the main task in the implementation phase?. A. continuous monitoring and analysis of the progress of the project B. take necessary measures to adjust the plan C. coordinate manpower and other resources to implement engineering project plans D. through analysis, it is found that management work and improve management measures, is the continuous improvement of management work 4, the world bank, the Asian Development Bank loan project and the International Federation of Consulting Engineers (FIDIC) project and conditions of contract for construction equipment design and construction contract conditions are used (mode). A. construction unit sets up project management organization B. commissioned a consulting firm to assist in the management C.EPC D. project management by professional organization

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档