市政自己完善(The city itself is perfect)
Plus relevant sub project acceptance. 3. units after the completion of the project, the construction unit shall organize relevant personnel to conduct inspection and assessment, the general supervision engineer shall organize the professional supervision engineer on the project quality of the completion of pre acceptance, on the existing problems, timely rectification shall be borne by the construction unit. After the completion of the rectification, the construction unit shall submit the project completion report to the construction unit, and apply for the final acceptance of the project. 4. after the completion of the subcontracted project in the unit project, the sub contractor shall conduct the self test of the contracted project, and shall examine and accept it according to the procedures stipulated in this standard. During acceptance, the Contractor shall send someone to attend. Subcontractors should be subcontracted project quality control, data integrity, and shall pay the general contractor, the general contractor unified on completion of the project file. 5. construction units receive the project completion acceptance report, construction units should be responsible for the organization of construction (project) (including subcontractors), design, investigation and supervision units (project) responsible for the acceptance of unit works.
The main contents of the 38. project completion report: (1) general situation; (2) the construction organization design documents; (3) check the construction quality of the project; (4) in accordance with laws and regulations and mandatory standards for construction; (5) the construction performance of engineering design documents; (6) contract implementation situation.
39. construction quality and technical control of lime stabilized soil base: p305
40. construction quality and technical control of cement stabilized soil base course:
41. lime fly ash stabilized macadam base construction:
您可能关注的文档
- 吸塑成型缺陷和形成原因(Blister molding defects and causes).doc
- 吸烟的作文(Smoking composition).doc
- 喜剧片名(Comedy name).doc
- 喜欢做菜的进来学学(He who likes cooking comes in to study).doc
- 吴博士健康园 三高(Dr. Wu health park, three high).doc
- 夏朝的历史其实是商朝的一部分(The history is a part of the Shang Dynasty).doc
- 夏感(Summer feeling).doc
- 夏河(Xiahe).doc
- 夏季短信)(Summer SMS)).doc
- 夏季混凝土施工技术交底(Concrete construction techniques in summer).doc
最近下载
- 2025年普通高等学校招生全国统一考试(黑吉辽蒙)化学含答案.docx VIP
- 蒂森电梯MC2电气原理图纸标注.pdf
- XCT80L6_1汽车起重机技术规格书.pdf VIP
- 索尼SW7600GR中文说明书.pdf
- 2026年时事政治测试题库100道附参考答案(完整版).docx VIP
- 儿科抢救药品临床应用与管理.pptx VIP
- 河北广谋新材料科技有限公司年产600万平方米复合革及隔音布、400万平方米新型复合网项目环境影响报告表.docx VIP
- 部编版语文五年级下册第七单元教材解读大单元集体备课.pptx VIP
- 部编版语文五年级下册第六单元教材解读大单元集体备课.pptx VIP
- 部编版语文五年级下册第五单元教材解读大单元集体备课.pptx VIP
原创力文档

文档评论(0)