细石混凝土地面施工工艺标准(704-1996)(Standard for construction of fine stone concrete floor (704-1996)).docVIP

细石混凝土地面施工工艺标准(704-1996)(Standard for construction of fine stone concrete floor (704-1996)).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
细石混凝土地面施工工艺标准(704-1996)(Standard for construction of fine stone concrete floor (704-1996)) Range The process standard is applicable to the fine stone concrete surface layer of industrial and civil buildings. Construction preparation 2.1 materials and main equipment: 2.1.1 cement: more than 425 Portland cement, ordinary portland cement and slag Portland cement shall be adopted. 2.1.2 sand: coarse sand, mud content is not greater than 5%. 2.1.3 stone: coarse aggregate with stones, the maximum particle size should not be greater than the thickness of the surface layer of 2/3. The particle size of the stone concrete surface shall not be greater than 15mm. 2.1.4 main equipment: concrete mixer, plate vibrators, trolley and a small bucket, half barrels, broom, 2m on foot, iron roller, wood trowel, spade, wire brush, chisel, hammer, iron trowel. 2.2 operating conditions: 2.2.1 interior wall has been played well, +50cm horizontal line. 2.2.2 through the floor of the riser has been completed, the tube blocked dense. Buried tube has been completed hidden inspection procedures. The 2.2.3 door frame has been installed and has been secured and nailed to the inside of the doorframe. 2.2.4 base is a precast concrete slab, concrete slab should be filling density, plate end gap should take prevention measures. Operation process 3.1 fine stone concrete process: Look for elevation, surface layer, horizontal line, base treatment, sprinkle wet, plastering cake Reinforcement to brush cement slurry, pouring fine stone concrete, plaster, laminated light curing For 3.1.1 elevation, elastic surface horizontal line on the wall: according to the existing +50cm standard high level, measure the horizontal ground surface layer, playing around the wall, and to take steps, landing, and the corridor outside the room elevation echoes, consistent. 3.1.2 grassroots treatment: first clean the dust, and then stick on the base of the slurry peel shovel, and use alkaline water to brush off the oil, and fina

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档