- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
郑州黄河大桥历史(History of the Yellow River bridge in zhengzhou)
Zhengzhou Yellow River railway bridge
Zhengzhou Yellow River railway bridge has new and old two.
The old bridge was originally named pinghan railway zhengzhou Yellow River bridge, the mother of the Yellow River bridge. It is the first railway bridge built on the Yellow River. By when
Zhengzhou Yellow River bridge
When a Belgian engineering company contracted, the project leader was called sandy. Qing guangxu 26 preliminary selected 1900 year after year, after the bridge site selection, has hired more countries such as Germany, the United States and the Italian engineer has carried on the field survey, completed in 1901 test, 1902 started to design, construction began in September 1903, completed on November 15, 1905, the qing guangxu thirty-two years on April 1, 1906 officially opened to traffic. The bridge is 3,015 meters long and is the longest bridge before the founding of the Peoples Republic of China. When the old bridge was completed, there were 102 holes, 26 of which were on the northern tip, and the 24 holes were at the south end, and the middle part of the center had a span of 21.5 meters and 52 holes. The bridge is made of steel pipe piles with inner diameter of 30 cm, 35 cm outside diameter and 120 cm diameter of spiral wing. The bridge also suffered repeated damage during the war. The first bridge at the north and south ends of the bridge was filled with 100 Bridges and a total length of 2,951 meters. In October 1969, a reinforced concrete slab was added on the bridge deck of the old bridge, and the car could be released at a regular one-way and convenient for highway traffic. It was demolished in 1987, leaving only five holes to be preserved as relics.
The new bridge of zhengzhou huanghe railway bridge is a double - wire railway bridge. Located at the downstream of the old bridge, the two sides of the old bridge are 500 meters and 375 meters apart. Opened on May 14, 1958, and opened to traffic on
您可能关注的文档
- 纯净真空铬铁(Pure vacuum ferrochrome).doc
- 纯净真空铬铁合金化学分析方法(Chemical analysis method of pure vacuum chromium iron alloy).doc
- 纯蒸汽发生器(Pure steam generator).doc
- 齿轮专业英语大全(Gear professional English major).doc
- 脆性哮喘(Brittle asthma).doc
- 胆机入门参考手册(Introduction to bile machine primer).doc
- 胆碱受体激动药(Cholinergic receptor agonist).doc
- 道路照明控制(Road lighting control).doc
- 都可coco奶茶加盟(Coco milk tea can be joined).doc
- 鄂教版小学五年级下前五课(The fifth lesson of the fifth grade of the school of education).doc
- 石膏板吊顶施工工艺标准.pptx
- 消防控制室管理及火灾应急处置程序.pptx
- 年产4万吨环保汽车涂料、2.5万吨高分子新材料项目可行性研究报告写作模板-拿地申报.doc
- 2024-2025年第二学期2-5月伙食费通知.doc
- 3.2 用画线段图的策略解决问题(教学课件)三年级数学下册同步精品系列(苏教版).pptx
- 精品解析:江苏省南京市金陵汇文学校2024-2025学年八年级下学期月考历史试题(原卷版).docx
- 2016新大纲财经法规与会计职业道德课件(1-2章).ppt
- 2017新大纲财经法规与会计职业道德课件(1-2章).ppt
- 财经法规与会计职业道德 -第一章.ppt
- 上市公司ESG评级分歧对分析师盈余预测影响研究.doc
文档评论(0)