- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
混凝土工程规矩(Rules of concrete engineering)
This article is contributed by the return to the cloud
Doc documents may have a poor browsing experience at the WAP end. It is recommended that you choose TXT, or download the source file to the native view.
Rules for the management of concrete works
In order to improve the quality of concrete component project level, to achieve concrete vibratory compaction, clear edges and corners in good article, line and the mouth of the cave, ground leveling, concrete surface without voids, pits and vibration, less vibration, cold seam wait for a phenomenon, meet water concrete standards. Do always there, always does, always someone responsible, always someone supervision, establish a set of operable management procedures, engineering rules are hereby formulated concrete engineering rules.
A, the preparation of the concrete engineering 1. Ready-mixed concrete supply contracts signed a 1) the choice of basis: ready-mixed concrete mixing station selection focuses on the supply capacity of mixing station concrete mixing station, the workings of the mechanical equipment, and transport capacity, quality of the raw materials for the concrete, concrete test and quality control level, distance of concrete supply, coagulation soil test match after the technical indicators, the unit price of concrete and so on many factors. 2) the following technical quality guarantee conditions must be specified in the pre-mixed concrete supply contract: a. Quality assurance of concrete strength; B. Quality assurance of concrete condensation time and slump; C. Speed of supply of concrete; D. Guarantee of the quantity of concrete; E. the quality assurance requirements of the complete set of technical data for concrete; F. Requirements for cement, sand, stones, admixtures, concrete alkali content, anti-seepage, etc. 2. Pre-casting acceptance preparation 1); 2) pre-inspection and acceptance of template engineering; 3) approved by the supervision engineer. 4) concrete
您可能关注的文档
- 美国航天中心(The American space center).doc
- 美国惊呼中国高铁计划世界第一(The U.S. calls China's high-speed rail program the world's largest).doc
- 美国气体催化剂大全(American gas catalysts).doc
- 美国现代设计的发展(The development of modern American design).doc
- 美国邮编(The zip code).doc
- 美能达维修代码(Minable maintenance code).doc
- 美容院如何排兵布阵管理(How does beauty salon platoon management).doc
- 脉要精微(Pulse to subtle).doc
- 美食菲律宾语(2)(Food Filipino (2)).doc
- 美术建筑学(Art architecture).doc
- 新高考生物二轮复习讲练测第6讲 遗传的分子基础(检测) (原卷版).docx
- 新高考生物二轮复习讲练测第12讲 生物与环境(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第3讲 酶和ATP(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第9讲 神经调节与体液调节(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第11讲 植物生命活动的调节(讲练)(原卷版).docx
- 新高考生物二轮复习讲练测第8讲 生物的变异、育种与进化(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第5讲 细胞的分裂、分化、衰老和死亡(讲练)(原卷版).docx
- 新高考生物二轮复习讲练测第5讲 细胞的分裂、分化、衰老和死亡(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第12讲 生物与环境(讲练)(原卷版).docx
- 新高考生物二轮复习讲练测第11讲 植物生命活动的调节(检测)(原卷版).docx
文档评论(0)