浙大《建筑施工技术》在线作业答案(The answer to the online work of building construction technology in zhejiang university)
Zhejiang university building construction technology online homework
One, single choice (20 test questions, 40 points)
1. Classification of tower cranes according to lifting capacity classification ()
A. Walking type and self-elevating tower crane
B. Hoist crane with heavy arm variation and crane trolley
C. Tower turret and tower rotary tower crane
D. light, medium and heavy tower cranes
Correct answer: D
2. Prior to the construction of earthwork, the investigation and research should be carried out, and the construction shall be organized according to the engineering and hydrogeological conditions of the region as well as the climate and environment.
A. make reasonable construction plan
B. Sign the labor contract
C. Prepare for the construction
D. Start the report
Correct answer: A
3. Used for site cleaning, site formation, deep excavation and mechanical selection of backfilling operation.
A. A bulldozer
B. Shovel
C. Backhoe excavator
D. grab shovel
Correct answer: A
4. Pile foundation is a basic form formed by connecting a single pile in a number of roots.
A. at the top of the
B. central
At the bottom of the C.
Correct answer: A
5. It is appropriate to set the seam of the flat layer and the width of the seam is ().
10 mm a.
B. 15 mm
C. 20 mm
D. 25 mm
Correct answer: C
6. The Angle between the welded steel bars shall not be greater than ().
4 ° n.
B. 5 °
6 ° c.
D. 7 °
Correct answer: A
7. The excavation features of the shovel excavator are ()
A. go up and force the soil
B. Back down and force the earth to cut
C. back down and cut to the ground
D. Straight up and down, self-resected
Correct answer: A
8. () can be used as the control index of filling quality
A. Dry density of soil
B. The natural density of earth
C. Saturated density of soil
D. the saturated bulk of the soil
Correct answer: A
9. Reinforcement () is an important measure to save steel, improve the
您可能关注的文档
- 环境化学试题(Environmental chemistry test).doc
- 环境监测大题(Environmental monitoring is a big problem).doc
- 淮安市市区集体土地房屋拆迁补偿估价技术细则2007(The technical rule of compensation valuation for the collective land of urban collective land in huaian city 2007).doc
- 环糊精 (3)( (3)).doc
- 环境教育(Environmental education).doc
- 环卫定额(The sanitation quota).doc
- 环境艺术设计讲座(Environmental art design lecture).doc
- 环氧乳胶涂料适用期的确定(Determination of application period of epoxy emulsion coating).doc
- 混合动力(hybrid).doc
- 混合动力3(Hybrid power 3).doc
- 新高考生物二轮复习讲练测第6讲 遗传的分子基础(检测) (原卷版).docx
- 新高考生物二轮复习讲练测第12讲 生物与环境(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第3讲 酶和ATP(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第9讲 神经调节与体液调节(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第11讲 植物生命活动的调节(讲练)(原卷版).docx
- 新高考生物二轮复习讲练测第8讲 生物的变异、育种与进化(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第5讲 细胞的分裂、分化、衰老和死亡(讲练)(原卷版).docx
- 新高考生物二轮复习讲练测第5讲 细胞的分裂、分化、衰老和死亡(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第12讲 生物与环境(讲练)(原卷版).docx
- 新高考生物二轮复习讲练测第11讲 植物生命活动的调节(检测)(原卷版).docx
文档评论(0)