桥梁施工工艺规范(Technical specification for bridge construction).docVIP

桥梁施工工艺规范(Technical specification for bridge construction).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
桥梁施工工艺规范(Technical specification for bridge construction) 1 scope of application This standard is applicable to the installation of slab rubber bearings, basin type rubber bearings and ball bearings in highway and urban bridge engineering. 2 construction preparation 2.1 material 2.1.1 support: approach should have packing list, product certification and bearing installation maintenance rules, specification, quality and technical performance indicators in line with the current highway bridge bearing the provisions of the standard, and meet the design requirements. 2.1.2 preparation of epoxy mortar material: dibutyl, ethylenediamine, epoxy resin, xylene, fine sand, in addition to the fine sand other materials should have certificate and operation instruction, fine varieties, quality should comply with the regulations of relevant standards. 2.1.3 preparation of concrete and compensation for shrinking mortar materials. 2.1.3.1 cement: suitable for Portland cement and flexible Portland cement. Approach should have product certification or factory inspection report, after in response to the strength, stability and performance of the other necessary sampling second-round exam, the quality must conform to the existing national standard GB175 Portland cement and ordinary Portland cement, etc. When the cement quality is doubtful or the cement is more than three months old, it must be retried before use, and the test results are used. Different types of cement shall not be used for mixing. 2.1.3.2 sand, sand the varieties, quality should comply with the current national standard technical specification for construction of highway bridge JTJ041 requirements, in according to the current national standard after the aggregate for highway engineering test procedures JTJ058 the provisions of the sampling test. 2.1.3.3 stones: should use hard pebbles or gravel, and according to the origin, category, processing methods and specifications of different situation, according to the curren

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档