桥梁施工(Bridge construction).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
桥梁施工(Bridge construction) Bridge construction. TXT marriage is keyboard, too many order and rules; Love is a mouse, a little. Men are more important than hosts; Women look like a monitor. Everything can be seen. DefAhtBie4Ksv4urPDi18l 1019736083 Bridge construction The lower structure 1. Construction process of bored pile Please fill in the written construction application report first, and then the supervision engineer will approve the project. The wire point is the reference point of the supervision engineer, and the infrared rangefinder is used to set the sample. After accurately releasing the pile into the protective tube, after the supervision engineer has checked the correct check, the pile position control pile is led out by the theodolite. The drill is intended to use a rotary drill. The drilling rig is installed first, the drill rig and lifting system are installed and the rig is adjusted. The position deviation of the drill pipe shall not be more than 2cm, and the rotary table should be checked in and out. If there is any inclination or displacement, adjust and correct it in time. The drilling mud site is prepared and stored in the mud pool. Check the aperture and perpendicularity in the drilling process and make a good drilling record. Clearance hole: after drilling depth meets the design requirements, notify the engineer to inspect the hole and immediately clear the hole. The clearance method is adopted. [6] put a reinforcing cage: reinforcing cage of reinforcement in accordance with the design drawing class at the scene of the centralized blanking forming, according to the required length is divided into 2-3 day, reinforcing cage welding firmly, hanging hole, main reinforcement, stirrups position accurately. The height deviation of the steel cage shall not be greater than or minus 5cm. The underwater concrete is used to mix the concrete, transport and deliver the concrete to the tube. The catheter is first installed before perfusion. When installing the

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档