西南交《土木工程概论B》在线作业二(Southwest China, Introduction to civil engineering B online homework two).doc

西南交《土木工程概论B》在线作业二(Southwest China, Introduction to civil engineering B online homework two).doc

  1. 1、本文档共12页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
西南交《土木工程概论B》在线作业二(Southwest China, Introduction to civil engineering B online homework two) Southwest China, Introduction to civil engineering B online homework two Total score: 100 test time: - Radio examination A multiple-choice question Radio examination questions (15 questions, 60 points) 1. the maximum longitudinal slope of the motorway is () A. 5%~7% B. 3%~5% C. 1%~3% D. 1% or less Full marks: 4 2. the following options do not belong to the airport runway auxiliary road facilities is ___ A. parking lot B. runway shoulder C. stop Lane D. clearance Road Full marks: 4 3. for cable-stayed bridge, when using the symmetrical section and the bridge clearance requirement is large, the use of ____ A. single tower B. Twin Towers style C. multi tower D. combination type Full marks: 4 (4.) is the most effective method in the construction of rock excavation. A. blasting B. excavation C. spud in! D. drilling Full marks: 4 The beam with 5. end hinged bearing and the other end rolling bearing is called () A. simply supported beam B. cantilever beam C. clamped beam One end of the D. is simply supported and the beam is clamped at one end Full marks: 4 6. road according to its location, traffic performance characteristics are mainly divided into ____ A. expressway, general highway B. main road, Branch Road C. highways, urban roads, dedicated roads D. highway, urban road Full marks: 4 7. the minimum radius of the plane of a railway line is not subject to the following restrictions A. rail class B. running speed C. running distance D. terrain Full marks: 4 The following 8. options which is the most important airport engineering facilities _ ___ A. terminal building B. runway C. apron D. navigation station Full marks: 4 9. bicycle lanes width should be considered safe distance between two vehicles, two lane for __ __ A. 1m B. 1.5m C. 2m D. 2.5m Full marks: 4 10. of the subgrade auxiliary facilities, which of the following is a protective measure? A. grow grass and plant trees B. re

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档