质检部管理制度(Quality control department management system).doc

质检部管理制度(Quality control department management system).doc

  1. 1、本文档共14页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
质检部管理制度(Quality control department management system)

质检部管理制度(Quality control department management system) Garment factory production product quality supervision and punishment for reference The lower and first parts of the production line must be convened by quality management department, technical department and related production Personnel for first examination, And make the first inspection record. Products that are not subject to first inspection shall not be continued The quality management department shall be responsible for all losses caused by the production. Production department, technical department, quality management department, workshop leader, team leader and checker should be established The idea of quality first shall be familiar with process standards and quality standards for the products being put into operation. No To reduce or relax at will. Substandard semi-finished products shall not be allowed to flow into the next link Batch) Such as the flow into the next link, the production team should undertake the responsibility of repair. One . Statistical leak detection rate One Rework allowed within the team Ten Per cent of the daily output per person Fines for the process 05 Yuan. Two The product flows into the next production link (pointing out the teams and groups) The rework rate is allowed Five %, press Daily output calculation, Fines for each team One Yuan. A fine for the inspector of the team Zero point five Yuan. Three Quality rework rate of team is over Ten %, handled by quality accident. Four The qualified rate of product after inspection is up to the reinspection group One hundred %, no rework rate. Check by finishing and quality check. Found a rework and fined the reinspection personnel One Yuan, tired Calculation. And let re examination team responsible for repair, Re examination team should carefully fill out each production team Inspection rate and rate of defective products. Read the membership Limited special privilege of 7 members immediately early adopters Five Repair items within

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档