- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
基础筏板及基础梁工程施工方案(Construction plan of foundation raft and foundation beam)
基础筏板及基础梁工程施工方案(Construction plan of foundation raft and foundation beam)
Construction plan of foundation raft and foundation beam
I. General Situation and main works:
The foundation design of this project is reinforced concrete beam raft foundation. Raft plane is L shape, raft thickness 550mm, width 22.16m, east-west length 44.36m, north-south length 82.78m. The cross section size of foundation beam is 400 * 600mm. Concrete mark is C25, total square amount is 1310m3, the amount of steel used is 150T. In the 16-18 axis, close to the 18 axis, leaving a 1m width through the pouring zone, after pouring with concrete, after the completion of the main casting.
Two 、 construction arrangement and main construction plan:
The construction work of the formwork is small and the construction is simple, so the construction section is not considered, and the whole is a construction section. The construction of reinforcing bar and concrete is divided into two construction sections after the pouring zone is taken as the boundary, and the construction of simple water flow is simple. The steel works shall be first constructed with 1-16 shafts (I sections), and the concrete shall be poured after self inspection and hidden inspection and acceptance. In the pouring of I section of concrete at the same time continue to tie 18-58 axis (II section) steel bar, self inspection, hidden inspection acceptance, continuous placement of II section of concrete. (I section of concrete is about 660m3, II section of concrete is about 650m3). The main construction methods are as follows:
1. template engineering
(1) the template is formed by the combined steel formwork, and the U type ring is connected. After the cushion surface has been cleaned up, it will be assembled at first, and the isolating agent should be painted before the template is assembled. (isolating agent mainly uses engine oil). The main specifications of peripheral side template is 1500 * 300mm, 1200 * 300mm, 900 * 300mm, 600 * 300mm. t
您可能关注的文档
- 国际会计准则第24号--对关联者的揭示(International Accounting Standards No. twenty-fourth -- revealing the related persons).doc
- 国际会计准则第41号-农业(The International Accounting Standards No. forty-first - agriculture).doc
- 国际公法论述(Discussion of international law).doc
- 国际关系的关系性和跨文化性(The relationship between international relations and cross cultural).doc
- 国际内部审计(International internal audit).doc
- 国际分工(international division of labor).doc
- 国际会计准则第35号--中止经营(International Accounting Standard No. thirty-fifth to suspend operations).doc
- 国际关系互动理论初探(On the relationship between international interaction theory).doc
- 国际战略联盟中的人力资源管理(Human resources management in international strategic alliances).doc
- 国际现代物流对中国物流的影响(The influence of international modern logistics on Chinese Logistics).doc
- 基础知识之成语运用(Idiom usage of basic knowledge).doc
- 基础设施配套费征收细则(Infrastructure fee collection rules).doc
- 基站基础学习(Base station learning).doc
- 基金业3年来规模停滞不前(The fund industry in the past 3 years the scale of stagnant).doc
- 基线分析(Baseline analysis).doc
- 基金持续营销的十大策略(The fund continued marketing ten strategies).doc
- 堆焊简要(Surfacing briefly).doc
- 堵不如疏,渠道不克不及成为堰塞湖(Blocking as sparse, channels can not become dammed lake).doc
- 堵不如疏,渠道不能成为堰塞湖管理(Blocking as sparse, the channel can not become a lake management).doc
- 塑料加工成型过程中遇到的问题(注塑成型不良(Encountered in the process of plastic injection molding problems (bad).doc
文档评论(0)