给水加压泵房施工方案(The pressurized water supply pumping station construction scheme).docVIP

给水加压泵房施工方案(The pressurized water supply pumping station construction scheme).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
给水加压泵房施工方案(The pressurized water supply pumping station construction scheme)

给水加压泵房施工方案(The pressurized water supply pumping station construction scheme) Jiangsu Datun aluminium company aluminum water pressure pump Shi work group weave set up meter Datun coal construction and installation engineering company Erlinglingsan in June 26th Organization: To examine: Chief engineer: Engineering technology department: Safety supervision station: Chief engineer: I. basis for compilation 1, casting circulating water construction plans 2, the relevant laws, regulations, regulations and Jiangsu budget quota 3, construction acceptance specification 4 、 construction contract Two, engineering survey The project construction area of 210.83 square meters, is a brick structure, the shaft is to. The opening pool structure depth of -3000 mm, the bottom concrete thickness of 400 mm, the wall thickness of concrete 300 Mm, the other is the base foundation, the foundation depth of -1600 mm, the size of 2600*2600, The roof is a cast-in-place concrete beam and slab structure with a height of 4.6m, a seismic rating of three, and a seismic intensity of 7 degrees Anti. Three 、 construction preparation 1 、 construction quality and safety management system Project Manager: Zhang Wenming Safety Officer: Chen Caixing, quality manager: Huang Ziran Class: Li Dong Mason woodworking class: Wang Fuqun class: Li Dong bar 2 、 construction machinery: concrete mixer, vibrating bar, flat vibration machine. 3, the construction personnel arrangement: Mason 15 people, 20 people, 10 people of reinforced wood, 7 other people. 4, the main material: Stone: 400t, 200t, 300t: cement: sand, Wood: 15 square meters, 1000 square meters, reinforced steel mould:: 25t, 50 thousand pieces of red brick. Four, construction schedule: (see drawings) Five, construction methods: in accordance with the basic construction procedures of construction projects, first underground, and then on the ground, first The main body, the principle of decoration after construction. 1. Basic works The project shall be orga

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档