- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
施工总平面布置(The general layout of construction)
施工总平面布置(The general layout of construction)
General layout of construction
I. the function of the general construction plan
The general plan of the building is the general layout of the construction site of the proposed project. According to the construction plan and schedule requirements, the construction site of the road traffic, material warehouse, affiliated enterprises, temporary housing, temporary water pipeline make the layout reasonable, so as to correctly handle the relationship between the space required during the whole construction site facilities and buildings, the construction of the quasi permanent. The rendering ratio is typically l:1000 or 1:2000.
Two, the contents of the general construction plan
The main contents of the general construction plan are as follows:
1, the original topography and contour lines, all existing ground, underground buildings, structures, railways, roads and pipelines;
2 all proposed permanent structures, structures, roads and pipelines;
3. All temporary facilities for construction (see Chapter sixth);
4, permanent and semi permanent coordinate positions, soil sampling and soil dumping location.
Three, construction general plan design steps are as follows
(I) introduction of off-site traffic
1, when a large number of goods transported by the railway site, should first solve the railway where to introduce and how to layout problems. When there is no permanent railway special line in the yard, it can be built in advance so as to serve the construction of the project. But because of the introduction of the railway will seriously affect the transportation and safety, so the railway construction site, introduced should be close to one side or both sides of the site; only when the large site is divided into several independent area construction, railway can lead the central site, at this time, the railway should be located in each area of the side.
2, when a large amount of material from the water into the scene, should make full
您可能关注的文档
- 影响音频质量的几种重要的参数(Effects of several important parameters of audio quality).doc
- 影响物流中心选址因素(The factors that influence the location of logistics center).doc
- 影响马铃薯生长的外界环境(Environmental influence on the growth of potato).doc
- 影视论文(Film paper).doc
- 影评《活着》张艺谋(The alive Zhang Yimou).doc
- 往届安全员考试(The previous safety examination).doc
- 征地程序(The procedure of land expropriation).doc
- 徐小平美国掀创业风暴栽种梦想比什么都重要(Xu Xiaoping storm lift the entrepreneurial dreams are more important than what is planted).doc
- 征税问题(Tax problems).doc
- 影像学简答题(Imaging short answer).doc
- 施工实习个人总结(The construction of personal practice summary).doc
- 施工图设计制图基本规则(The basic rules of construction drawing design drawing).doc
- 施工技术答案(The construction technology of the answer).doc
- 施工工艺大全大型悬挑现浇钢筋混凝土异形柱施工技术(The construction technology of the large cantilever cast-in-place reinforced concrete special-shaped column construction technology).doc
- 施工组织与进度控制(The construction organization and schedule control).doc
- 施工日记资料(Construction diary).doc
- 施工组织措施(The construction organization measures).doc
- 施工组织目录(The Construction Organization Directory).doc
- 施工放线测量技巧(The construction of line measurement techniques).doc
- 施工组织设计讲座(Department of construction organization design).doc
文档评论(0)