施工工艺大全大型悬挑现浇钢筋混凝土异形柱施工技术(The construction technology of the large cantilever cast-in-place reinforced concrete special-shaped column construction technology).docVIP
- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
施工工艺大全大型悬挑现浇钢筋混凝土异形柱施工技术(The construction technology of the large cantilever cast-in-place reinforced concrete special-shaped column construction technology)
施工工艺大全大型悬挑现浇钢筋混凝土异形柱施工技术(The construction technology of the large cantilever cast-in-place reinforced concrete special-shaped column construction technology)
Construction technology of large cantilever cast-in-place reinforced concrete special-shaped column
Aerospace Department, a demonstration hall, a large integrated public facilities, North and South 90m, east-west width of 50m, construction area of 10010m2. The building, with a presentation hall as its core, is surrounded by 2 exhibition corridors. The north side is the 3 floor, with exhibition halls, lecture halls, secret rooms, VIP rooms and conference rooms. The structure adopts large space and large span frame type cast-in-place reinforced concrete frame shear wall structure system. With the size of 9m * 12M, 6m * 8m, the four corners of the 180mm thick reinforced concrete shear wall a. The height of the first floor of 8m, 2m, two layers of high of 4m, central hall roof adopts oblique orthogonal welded spherical grid, grid size is 3.615m * 3.615m * 3.615m grid, north-south span is 65m, pick 6m hanging on the south side, East span is 45m, covering an area of about 3000m2. The highest point on the top of the grid is 34.280m. To reflect the grandeur and atmosphere of its architectural design, the roof of the exhibition hall is designed as a Y shape with a North height and a low south. The height is about 12M, the spherical grid supporting frame columns are processes, set up 6 harrier bidirectional variable cross-section folding cantilever column, the column height of 33.38m, 17m from the above South gradual deformation of cantilever, cantilever length is 6.36m, the column section (1.85~2.836) * 0.6m, two North and south side line angles 68.65 degrees and 64.17 degrees. According to the arrangement of the whole structure, the cantilevered part in 19.00m, 23.00m and 27.0m site set up 3 tailgate beam (Figure 3-15-1). The main shaft bars are 46 Phi 32, 10, stirrups? Concrete strength grade is C40, single column l7m
您可能关注的文档
- 影视论文(Film paper).doc
- 影评《活着》张艺谋(The alive Zhang Yimou).doc
- 往届安全员考试(The previous safety examination).doc
- 征地程序(The procedure of land expropriation).doc
- 徐小平美国掀创业风暴栽种梦想比什么都重要(Xu Xiaoping storm lift the entrepreneurial dreams are more important than what is planted).doc
- 征税问题(Tax problems).doc
- 影像学简答题(Imaging short answer).doc
- 循环对称结构的模态分析简介(Modal analysis of cyclic symmetric structure).doc
- 循环水开车(Circulating water drive).doc
- 微元法在解题中的应用(The application of infinitesimal method in solving the problem).doc
- 施工组织与进度控制(The construction organization and schedule control).doc
- 施工日记资料(Construction diary).doc
- 施工组织措施(The construction organization measures).doc
- 施工组织目录(The Construction Organization Directory).doc
- 施工放线测量技巧(The construction of line measurement techniques).doc
- 施工组织设计讲座(Department of construction organization design).doc
- 施工考试复习要点(The construction of test points).doc
- 施工资料顺序(The construction of data sequence).doc
- 施工预算与施工图预算的区别(The difference between construction budget and construction drawing budget).doc
- 施工项目管理组织机构(Organization of construction project management).doc
文档评论(0)