网站大量收购独家精品文档,联系QQ:2885784924

混凝土工程施工质量的控制(Quality control of concrete construction).doc

混凝土工程施工质量的控制(Quality control of concrete construction).doc

  1. 1、本文档共15页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
混凝土工程施工质量的控制(Quality control of concrete construction)

混凝土工程施工质量的控制(Quality control of concrete construction) Construction quality control and supervision of concrete engineering 2008-8-29 14:18 According to many years of practical work summary of concrete engineering and quality control of civil engineering in a relatively comprehensive and detailed analysis on the concrete structure has a large proportion in the construction engineering, the absolute role in the safety of the structure, reliability and durability, different from the influence of concrete components, such as cement admixture and aggregates on the internal structure of concrete, illustrates concrete engineering quality control supervision should be from the quality of the production of raw materials of concrete to control, the quality control of concrete is a whole process of the monitoring process, supervision work should always follow, for reference. In Yunnan electric power engineering construction, the concrete structure has a large proportion in the construction engineering, the absolute role in the safety of the structure, reliability and durability, because Yunnan Province geological, geomorphological and climatic diversity of alpine valley, arranged in a crisscross pattern from more than 3000 meters above sea level, to hundreds of meters, a three-dimensional climate change, the temperature difference between day and night. So the power facilities affected the erosion of the environment is particularly serious, a power transmission line spanning hundreds of kilometers, the elevation kilometer, during which the cold fever or wet dry weather effects, for line tower and substation building, structure foundation and equipment foundation concrete structure, from design to construction, until use and protection should be considered in the special environment of power transmission project of the concrete strength and durability requirements. Therefore, in the power engineering construction, the supervision engineer is very important to the quality contr

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档