- 1、本文档共36页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
第一节 土(石)方工程(Section 1 earth (stone) Fang Gongcheng)
第一节 土(石)方工程(Section 1 earth (stone) Fang Gongcheng)
First, the earth (stone), Fang Gongcheng?
What about?
?? 1 earthworks
?? 1.1 soil classification: see table A.1.10 soil and rock (Platts) classification table.
1.2. Artificial excavation earthwork quota, except for digging silt and quicksand for wet soil, are prepared by dry soil, such as digging wet soil, multiplied by factor 1.18. The division of dry and wet should be conducted according to the geological survey data, and the underground normal water level is divided. The underground water level above is dry soil, and the ground water below the normal water level is wet soil.
1.3. The quota does not include the drainage costs for construction below the water table, which shall be calculated separately. In case of excavation, if surface water needs to be excluded, it shall be calculated separately.
???? 1.4 artificial excavation depth to 1.5m, such as more than 1.5m, the manual will be transported to the ground soil, table A.1.1 should be increased (not less than 1.5m days after deducting the depth and quantity).
????????????????? ultra deep excavation work to increase artificial (unit: 100m3) A.1.1
Deep 2m within the depth of 4m, within the depth of 6m, within the depth of 8m, within 10m, less than 5.27, 15.57, 23.34, 32.01, 40.82. Note: if from the pit with the machine out of the soil, according to the mechanical lifting of soil quotas. The actual use of machinery may not be converted at the same time.
1.5. When digging the earth under the support of the retaining plate, multiply the coefficient by 1.2 according to the size of the excavation.
???? 1.6 spacing between piles is less than 4 times of the pile diameter (or piles), digging the earth between piles (including earthwork, groove, pit) according to the corresponding sub purpose manual multiplied by the coefficient 1.25, mechanical digging the earth between piles according to the corresponding sub purpose machinery multiplied by the coefficient 1.1, enginee
您可能关注的文档
- 理正边坡水利(Lizheng slope water conservancy).doc
- 理论力学大纲 - 北京航空航天大学欢迎您(Welcome to Beihang University - outline of theoretical mechanics).doc
- 理论力学大纲(Outline of theoretical mechanics).doc
- 理论题txt(Theoretical questions TXT).doc
- 琼州海峡跨海通道筹建提速(Qiongzhou Strait Crossing the sea to speed up the preparation).doc
- 瑜伽呼吸重点(Yoga breath focus).doc
- 瑜伽的基本知识你知道多少(How much do you know about the basic knowledge of Yoga).doc
- 理想的建筑及其徽州老房子(Ideal buildings and their old houses in Huizhou).doc
- 理正工程地质数据库2.6更新说明(For engineering geological database update 2.6).doc
- 瑞士的幼儿园制度(The kindergarten system in Switzerland).doc
- 2024年新教科版8年级上册物理全册课件(新版教材).pptx
- 2025年春新人教版物理8年级下册全册教学课件 (3).pptx
- 2024年新教科版8年级上册物理全册教学课件(新版教材) (2).pptx
- 2025年春新人教版物理8年级下册全册课件 (2).pptx
- 2024年新教科版8年级上册物理全册教学课件(新版教材).pptx
- 2024年秋季新人教版化学9年级上册全册教学课件.pptx
- 2025年春新人教版8年级下册物理全册课件.pptx
- 2025年春新人教版物理8年级下册全册教学课件 (2).pptx
- 2024年秋季新人教版9年级上册化学全册教学课件(新版教材).pptx
- 2025年春新沪粤版8年级物理下册全册课件.pptx
文档评论(0)