- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
钢筋计算规则(Reinforcement calculation rule)
钢筋计算规则(Reinforcement calculation rule)
Reinforcement calculation rule
Rules for calculation of reinforcement quantities
(1) Rules for calculation of quantities of steel reinforcement
1, steel works, should be distinguished from cast in place, prefabricated parts, different steel grades and specifications, according to the design length multiplied by the weight of units, tons of computing.
2, when calculating the amount of steel works, the design of the length of the steel tower has been specified. According to the length of the tower, the length of the tower is not included in the design, and it is not included in the calculation of the length of the tower. Reinforcement, electroslag pressure welding, sleeve extrusion and so on, in order to calculate.
3, pre tensioned prestressed reinforcement length is calculated according to the shape and the size of the component, post tensioned reinforced by prestressed reinforcement design provisions of the reserved channel length, and the difference between different types of anchorage, were calculated according to the following provisions:
(1) when using the screw anchor at both ends of the low alloy steel bar, the prestressing steel bar is reduced by 0.35m by the reserved hole length, and the screw rod is calculated separately.
(2) one end of the low alloy steel bar is inserted with an end plug, and the length of the prestressed steel bar is calculated according to the reserved hole length at the other end of the screw anchor, and the screw is calculated separately.
(3) one end of the low alloy steel bar is inserted with an end piece and the other end of the bar is supported by a bar; the prestressed steel bar is increased by 0. 15m, and the prestressed steel bar is increased by 0.3m at both ends with the help bar anchor.
(4) the length of the prestressed steel bar is increased by 0. 35m after adopting the post tensioning silicon self anchoring for the low alloy steel bar.
(5) low alloy steel or steel strand adopts JM, XM an
您可能关注的文档
- 设施、设备管理中的以养保修(Maintenance warranty in facilities and equipment management).doc
- 设计、创建和维护索引(Design, create, and maintain indexes).doc
- 论阅读与书籍(On reading and books).doc
- 设计使用100年(Designed for 100 years).doc
- 设计制图规范(Design drawing specification).doc
- 设计合理厨房(Reasonable kitchen design).doc
- 设计定额(Designed Norm).doc
- 设计师准则(Designer standards).doc
- 设计师常用软件(Designer software).doc
- 设计提升品牌附加值(Designed to enhance brand value added).doc
- 钢筋试图(Rebar attempt).doc
- 钢筋的专业术语(Technical terms for reinforcement).doc
- 钢筋计算公式 欢迎收藏(Reinforcement calculation formula welcome to collect).doc
- 钢筋连接套筒钢管生产要注意的几点(How many points should be paid attention to in the production of steel pipe with connecting sleeve).doc
- 钢筋重量换算(Steel weight conversion).doc
- 钢筋算量基础方式小结(Brief summary of basic mode of reinforcement calculation).doc
- 钢筋计算时的一点小常识(A little common sense when calculating steel bars).doc
- 钢筋锚固长度1(Anchorage length of reinforcement 1).doc
- 钢筋重量表(Steel weight list).doc
- 钢筋计量(Reinforcement measurement).doc
最近下载
- 2025年深入贯彻中央八项规定精神学习教育知识竞赛试题及答案.docx VIP
- DLT5710-2014 电力建设土建工程施工技术检验规范.docx
- 常见病与多发病的防治_培训课件.ppt VIP
- 社会心理学(全套完整课件)课件ppt.pptx VIP
- 数据统计与分析技术.pptx VIP
- 往复活塞压缩机技术讲座郁永章(参考).ppt VIP
- 浅析员工关系管理—毕业论文.doc VIP
- 湖北省黄石市阳新县2023-2024学年六年级下学期期末英语试题(含笔试答案,无听力音频,无原文).pdf VIP
- 《药品经营许可证》申请表格.doc VIP
- 北京市朝阳区五年级下学期数学期末试卷.doc VIP
文档评论(0)