网站大量收购独家精品文档,联系QQ:2885784924

动设备方案(英文版)分析.doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
动设备方案(英文版)分析

SAUDI KAYAN PETROCHEMICAL CO., LTD. SAUDI KAYAN PETROCHEMICAL COMPLEX U O PROJECT FLARE AREA DOCUMENT TITLE: METHOD STATEMENT FOR INSTALLATION of ROTATING EQUIPMENT SCC DOCUMENT NO: 063-QP-2-1003    Owner : Saudi Kayan Petrochemical Al-Jubal Saudi Arabia PMC : FLOUR CO. LTD. CONTENTS 1.0 Scope 3 2.0 REFERENCES 3 3.0 GENERAL 4 4.0 PROCEDURE 4 5.0 Project HSE Plan 11 6.0 Attachments 11 Scope The procedure is aimed to describe the rotating equipment, like pump, compressor, etc in Saudi Kayan UO Project. The installation should strictly follow all the applicable specification, standard, procedure (including HSE Plan), drawing and installation manual from vendor. If there is any conflict between this procedure and drawing requirement for the special requirement from equipment specification, the latter shall govern. At the same time, the procedure shall conform to the requirement from FLOUR CO.LTD. REFERENCES 2.1 API 610 2.2 API 686 2.3 Plot plan 2.4 Installation manual In which the installation procedures and allowable alignment tolerance can be found and referenced. 2.5 Vendor dwg Drawings provided by the vendor and from which detailed fabrication drawings, assembly drawings, and sectional drawings can be found in order to ensure the mechanical assembly can be performed correctly 2.6 Piping arrangement dwg From the drawings, the orientation and elevation of the equipment can be found. 2.7 Packing list From which the quantity of each equipment part to be packed and more accurate weight can be found. GENERAL 3.1 The inspection work comply with relevant project specifications,drawings,manufacturer’s documents and applicable codes or local regulations. 3.2 Manufacture’s documents ,drawings and installation instructions will be used as a part of this procedure. 3.3 Equipment to be assembled at site,such as large pump will be installed in accordance with the installation instruction suppl

文档评论(0)

yaocen + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档