停车场管理系统、道闸、楼宇对讲施工规范(Code for construction of parking lot management system, road gate and building intercom).docVIP

停车场管理系统、道闸、楼宇对讲施工规范(Code for construction of parking lot management system, road gate and building intercom).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
停车场管理系统、道闸、楼宇对讲施工规范(Code for construction of parking lot management system, road gate and building intercom)

停车场管理系统、道闸、楼宇对讲施工规范(Code for construction of parking lot management system, road gate and building intercom) Parking lot management system, gate, building intercom construction standard, Beijing anda weak construction team 1.1 along the wall laying pipe requirements The 1. line should be as far as possible by the requirement, neat, height from the ground, to avoid obscuring objects. The distance between the parallel line pipe and line pipe to be consistent, to the level of pipe transverse to cloth, perpendicular to the ground vertical cloth, turning to tidy. Along with the 2. corner laying line pipe in aisle with tap water pipe, the shelter by PVC tube, height from the ground about 100~250mm. 1.2 laying in the ceiling pipe line 1. ceiling in pipe laying pipe along the wall can refer to the requirements, also can use the shortest straight line distance pipe, PVC pipe and hose. 2. ceiling laying pipelines should be secured, can not affect the maintenance at the ceiling roof open, not overweight makes the ceiling collapse. If the ceiling capacity is relatively fragile, it should be considered in the cement on top of hoisting or laying along the wall. 1.3 along the wall laying underground pipe requirements 1. when laying underground pipe along the wall, should be considered as far as possible in the building when the. 2. can not damage the structure of beam. 3. pipeline in a thread to measure the on-off, insulation (signal line 10M, power line 30 M above) and mark. 1.4 slotted ground laying underground pipe requirements 1. in the hard cement floor, the floor board inside the pipe buried underground, the upper line pipe and the surface distance of not less than 15mm. 2. cars crossing the ground must be with the pipe and pipe the best road. With no available PVC walk wall tube, but must ensure that the cement layer and the upper tube surface 15mm. 3. if the ground below the waterproof layer, requirement of grooving, first of all to do a layer of waterproof layer, waterpro

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档