停车场管理系统、道闸、楼宇对讲施工规范(Code for construction of parking lot management system, road gate and building intercom).docVIP
- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
停车场管理系统、道闸、楼宇对讲施工规范(Code for construction of parking lot management system, road gate and building intercom)
停车场管理系统、道闸、楼宇对讲施工规范(Code for construction of parking lot management system, road gate and building intercom)
Parking lot management system, gate, building intercom construction standard, Beijing anda weak construction team
1.1 along the wall laying pipe requirements
The 1. line should be as far as possible by the requirement, neat, height from the ground, to avoid obscuring objects. The distance between the parallel line pipe and line pipe to be consistent, to the level of pipe transverse to cloth, perpendicular to the ground vertical cloth, turning to tidy.
Along with the 2. corner laying line pipe in aisle with tap water pipe, the shelter by PVC tube, height from the ground about 100~250mm.
1.2 laying in the ceiling pipe line
1. ceiling in pipe laying pipe along the wall can refer to the requirements, also can use the shortest straight line distance pipe, PVC pipe and hose.
2. ceiling laying pipelines should be secured, can not affect the maintenance at the ceiling roof open, not overweight makes the ceiling collapse. If the ceiling capacity is relatively fragile, it should be considered in the cement on top of hoisting or laying along the wall.
1.3 along the wall laying underground pipe requirements
1. when laying underground pipe along the wall, should be considered as far as possible in the building when the.
2. can not damage the structure of beam.
3. pipeline in a thread to measure the on-off, insulation (signal line 10M, power line 30 M above) and mark.
1.4 slotted ground laying underground pipe requirements
1. in the hard cement floor, the floor board inside the pipe buried underground, the upper line pipe and the surface distance of not less than 15mm.
2. cars crossing the ground must be with the pipe and pipe the best road. With no available PVC walk wall tube, but must ensure that the cement layer and the upper tube surface 15mm.
3. if the ground below the waterproof layer, requirement of grooving, first of all to do a layer of waterproof layer, waterpro
您可能关注的文档
- 体外碎石禁忌(Extracorporeal lithotripsy).doc
- 体彩营销方案(Sports lottery marketing program).doc
- 体操的作用和意义(The function and significance of Gymnastics).doc
- 住饭店须知!非常重要,特别是对女生!(It's very important to stay in a hotel, especially for girls!).doc
- 体检知识100问(Physical examination knowledge 100 questions).doc
- 住院患者的心理护理(Psychological care of inpatients).doc
- 体检肿瘤指标(Physical examination tumor index).doc
- 体检项目分类(Classification of medical examination items).doc
- 体液鉴定(Humoral identification).doc
- 体育健身休闲业(Sports fitness leisure industry).doc
- 基于人工智能教育平台的移动应用开发,探讨跨平台兼容性影响因素及优化策略教学研究课题报告.docx
- 高中生物实验:城市热岛效应对城市生态系统服务功能的影响机制教学研究课题报告.docx
- 信息技术行业信息安全法律法规研究及政策建议教学研究课题报告.docx
- 人工智能视角下区域教育评价改革:利益相关者互动与政策支持研究教学研究课题报告.docx
- 6 《垃圾填埋场渗滤液处理与土地资源化利用研究》教学研究课题报告.docx
- 小学音乐与美术教师跨学科协作模式构建:人工智能技术助力教学创新教学研究课题报告.docx
- 《航空航天3D打印技术对航空器装配工艺的创新与效率提升》教学研究课题报告.docx
- 教育扶贫精准化策略研究:人工智能技术在区域教育中的应用与创新教学研究课题报告.docx
- 《区块链技术在电子政务电子档案管理中的数据完整性保障与优化》教学研究课题报告.docx
- 《中医护理情志疗法对癌症患者心理状态和生活质量提升的长期追踪研究》教学研究课题报告.docx
文档评论(0)