graduate internship report power plant network(毕业实习报告电厂网络).docVIP

graduate internship report power plant network(毕业实习报告电厂网络).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
graduate internship report power plant network(毕业实习报告电厂网络)

Graduate internship report power plant network Write papers Network: March 1, 2009 we began a 15-day graduate internship in just ten days by visiting the plant, spending learning, so I learned a lot of books can not be learned through on-site valet learning I learned a lot for the future of social work and lay a good foundation. First, the practical purpose: through participation in power plant shift work, enable students to practice in the power plant on the basis of Renshi, better acquainted with the thermal power plant parts and their operation and maintenance work to understand the organization and management of production plants and technical and economic indicators to develop students practical skills and analytical ability to determine the accident, the following purposes: 1, by integrating theory with practice to enable students to fully apply the knowledge to analyze issues to determine the actual production, and further expand the students knowledge and training ability to work independently, 2, through internships and study the procedures to further enhance students’ understanding of safe and economic operation, to establish serious work style, 3, through internships, to collect and accumulate information about large-scale integrated operations, integrated operations to prepare 4, through practice and further develop students organization, discipline, collective spirit, and other fine qualities, is competent to lay the basis for future work. Second, the plant profile: Tangshan Douhe Power under Beijing Datang Power Generation Co., Ltd., located in Kaiping District, Tangshan City, Hebei Province, was founded in December 1973, sub-four construction, 8 October 1987, all units completed and commissioned, with a total installed capacity of 1550 MW. has two 125 MW units, two 250 MW units and four 200 MW units. Third, the training content 1, study and discuss safety procedures and conduct tests of the relevant sections. 2, the whole pl

您可能关注的文档

文档评论(0)

hhuiws1482 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:5024214302000003

1亿VIP精品文档

相关文档