大工13秋《土木工程概论》答案3(Great works, 13 autumn, introduction to civil engineering, answer 3).docVIP

大工13秋《土木工程概论》答案3(Great works, 13 autumn, introduction to civil engineering, answer 3).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
大工13秋《土木工程概论》答案3(Great works, 13 autumn, introduction to civil engineering, answer 3)

大工13秋《土木工程概论》答案3(Great works, 13 autumn, introduction to civil engineering, answer 3) In autumn 13 Civil Engineering Introduction online test 3 Total score: 100 test time: - RadioButtonList A multiple-choice question To determine the problem RadioButtonList, (a total of 10 questions, a total of 40 points.) 1. the following soils, must not be used as backfill earthwork filling material is the (B). A. gravel Frozen soil B. C. sand D. clay Score: 4 points 2. properties of soft soil are not included (D). A. natural porosity is relatively large B. high compressibility C. high natural water content The higher the shear strength of D. Score: 4 points 3. below on the collapsible loess of the exposition, the error is (B). A. has a large pore structure B. mainly with sand C. natural moisture is close to the plastic limit D. containing large amounts of soluble salts Score: 4 points 4. in the construction of prestressed concrete members, prohibited the use of cement containing (A), to prevent it from erosion of steel. A. chloride B. sulfide C. base D. fly ash Score: 4 points 5. (B) refers to the organization of building construction, each professional work team to complete the construction tasks in the corresponding section of each construction required duration of work. A. flow step B. waterbeat C. water strength D. interval time Score: 4 points 6. reinforced concrete prefabricated pile should reach the design strength in concrete (B)% to. A. 60 B. 70 C. 80 D. 90 Score: 4 points 7. minutes of the meeting (B). A. could not be used as evidence of claim B. can be used as proof of claim C. could be used as a reference for D. does not claim can be used as reference Score: 4 points 8. the following discussion about double code network diagram, the error is (B). A. arrow work The B. will usually work on names in the arrow line (or left) C. will be below the duration of the work written in the arrow line (or right) D. in the network diagram, allowed with double arrows Score: 4 points

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档