装饰工程-饰面板(墙柱釉面砖)(Decorative Engineering - decorative panels (walls, columns, glazed tiles)).docVIP

装饰工程-饰面板(墙柱釉面砖)(Decorative Engineering - decorative panels (walls, columns, glazed tiles)).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
装饰工程-饰面板(墙柱釉面砖)(Decorative Engineering - decorative panels (walls, columns, glazed tiles))

装饰工程-饰面板(墙柱釉面砖)(Decorative Engineering - decorative panels (walls, columns, glazed tiles)) (1) preparation for construction 1. materials (1) cement: Ordinary portland cement or slag Portland cement, white cement (used for wiping joints). (2) mineral pigment: (in harmony with glaze tiles, mixing with white cement). (3) sand: medium sand. (4): the use of lime paste plaster should not contain particles and impurities of uncured (such as the use of lime powder to be soaked in a week in advance). (5) glazed tiles: varieties, specifications, colors according to design requirements, and should have product certification. The water absorption rate of glazed tile shall not exceed 10%. The brick surface is smooth and square, and the thickness is uniform. No defects such as missing beam, falling angle and fracture can be avoided. In case of complex specifications, the color difference is great, should be measured by block, selection, classification, storage and use. 2, operating conditions (L) ceiling (ceiling), wall column, flour brush, plastering construction completed. (2) the wall cylindrical concealed pipelines, electrical box and window frame, installed, and after inspection. (3) the wall cylinder must be solid and clean (no oil pollution, floating slurry, residual ash, etc.), affect the brick paving, protruding walls, cylindrical parts should be chisel flat, too hollow, wall cylinder, using 1:3 cement mortar, layering, pressure, leveling. (water first, wet and then plaster). (4) the gap between the window sill and door and window frames and wall columns installed with l:3 cement mortar filling block; compacting; determine the aluminium door and window frame side impaction material gap should be designed, paving tiles before the paste protective film. (5) before large-scale construction, the sample walls and model rooms should be made first, and inspected by the quality and relevant departments to meet the requirements. (two) operation process 1, brick selection Tiles in

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档