- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
220~110~35kv变电站设计内容提要(Brief introduction to design of 220~110~35kv substation)
220~110~35kv变电站设计内容提要(Brief introduction to design of 220~110~35kv substation)
Brief introduction to design of 220/110/35KV substation
(1) substation load calculation
Consideration should be given to the growth of the local economy and the design period of the substations
(two) selection of main transformer
Mainly consider the number of transformer, capacity, transformer type, cooling mode, etc..
(1) selection of capacity and number of transformers;
According to the actual situation of the substation, the following principles should be chosen
1) the capacity selection of the main capacity, usually 5~10 years after the completion of the substation
2) to determine the main transformer capacity according to the nature and structure of substation voltage network with load, the substation has important users should be considered as a main variable when the rest of the time allowed transformer outage and overload capacity within, users should ensure that the grade one and two of the load. General substation, a disabled, should make the rest of the transformer to ensure all load 70%~80%.
3) the same level of voltage step-down transformer, capacity level should not be too much, should be serialized, standardized
4) for a substation on the outskirts of a large city, the middle and low voltage side has been built on the basis of the ring network, so it is appropriate to install two transformers.
(2) selection of winding form;
In accordance with the conditions of transportation, three-phase transformers are used in power plants and substations under 330KV and below.
(3) selection of transformer winding number;
According to: in the substation has three kinds of voltage, such as power through the main transformer on each side of the main transformer capacity reached 15% and above, no load or low side, but in the domestic installed substation reactive power compensation equipment, the main transformer should adopt three winding transformer.
(4) winding connection mode;
According
您可能关注的文档
- 告别孕期腹胀我有8妙法!(I have 8 tips to bid farewell to pregnancy abdominal distension!).doc
- 呋喃妥因片(nitrofurantoin tablets)(呋喃妥因片 (nitrofurantoin tablets)).doc
- 呼吸内科三基(Department of respiratory medicine three).doc
- 呼吸机2(Ventilator 2).doc
- 呼吸内科病历(Respiratory medical records).doc
- 呼吸慢支炎(Respiratory chronic bronchitis).doc
- 呼吸测量法(Respiration measurement).doc
- 呼吸科合理用药(Rational use of drugs in Department of respiration).doc
- 呼吸机(respirator).doc
- 呼吸机使用(Ventilator use).doc
- 21民用建筑设计防火规范(21 code for fire protection design of civil buildings).doc
- 2403h-e 开启snmp和设置mrtg(2403h-e opens SNMP and sets MRTG).doc
- 23040氯甲烷(23040 chloro methane).doc
- 23章 镇痛药(The 23 chapter is analgesic).doc
- 249句经典古文(249 classical Chinese Prose).doc
- 22条方法优化大脑的方法(22 ways to optimize the brain).doc
- 24小时尿蛋白(24 hours urine protein).doc
- 24式太极拳的姿势要求(24 type Taijiquan posture request).doc
- 24种思维,做一个纯粹的自己(24 kinds of thinking, to be a pure self).doc
- 24种不适合宝宝吃的食物(24 kinds of food that are not suitable for your baby).doc
最近下载
- 【絮语文】2026高一语文必修上册《江城子乙卯正月二十日夜记梦》课件.pptx
- 我的阿勒泰读书分享.pptx VIP
- 2023(新版)研学旅行指导师考试参考题库(含答案).pdf VIP
- 一种桥面沥青面层摊铺导线控制装置.pdf VIP
- 公路工程监理机构设置与岗位职责.docx VIP
- 2025中航材华顺航空资源服务(北京)有限公司招聘27人笔试参考题库附答案解析.docx VIP
- 活动机会视角下老年人地面公交出行空间公平性:理论、实证与优化策略.docx
- 村社区两委换届选举工作培训ppt课件.pptx VIP
- 2025年水利系统职称考试题库与答案.docx
- 《2024年 互换·共情·交流_共同体美学和创作者本位》范文.docx VIP
文档评论(0)