- 66
- 0
- 约1.39万字
- 约 10页
- 2017-09-15 发布于河南
- 举报
挡鼠板(Rat shield)
挡鼠板(Rat shield)
Rat shield
Product brief:
Transformer stop rat plate, rat plate, introduced the rat plate height instructions
Introduction: substation and power distribution room environment, equipment, construction of mouse anti rat and human factors, equipment factors - two measures: 1. main transformer bridge not installed anti mouse cover; such as furnace Village substation (89 years of rodent accident) iron 1 10KV main transformer bushing at the mouse caused by short circuiting arc. 2. wall bushing magnetic isolation gap; Baimiao substation (93 rodent accident) white 1 Main Transformer overhaul, for the construction of the ladder in the white 1 10KV transformer bushing, along the ladder by the wall bushing support mouse iron magnetic gap (18mm) into the 10KV high pressure chamber. 3., switch door cabinet clearance is not strict. The 4. main cabinet, cabinet level of busbar bridge (rat) distance is small. Three, the construction of 1. factors: the box mouse; Huayuankou substation (93 years of rodent accident) to replace the 10KV shunt CT, after the accident found a mouse and rat droppings in the box back to the CT. The construction site has 2. expansion of food; Magnolia (98 year rodent substation...
The reason of substation and power distribution room and prevention measures of rodent occur: prevention work: first, to achieve the mouse can not enter the high voltage room, control room, relay room, duty room, cable tunnel, do the windows and the rat guards pull tight, open the doors and windows closed timely, damaged doors and windows, glass, rat guards a report on the treatment. Second, the opening of the hole (due to long working hours, the day should be temporary plugging) to close tight, before the end of the work, the duty officer should work in conjunction with the person in charge of serious acceptance of hole plugging.
Third, no food or construction equipment packaging boxes into the room. With the rapid development of power industry, a substation and po
您可能关注的文档
- 投标人资格要求(Bidder qualification requirements).doc
- 抗衰老化妆品产品排行榜前十名(Top ten list of anti-aging cosmetics products).doc
- 抗衰老食物(Anti-aging food).doc
- 抗过敏中药治疗变应性鼻炎(Treatment of allergic rhinitis with antiallergic traditional Chinese Medicine).doc
- 抗高血压药--沙坦类(Antihypertensive drugs, losartan).doc
- 折弯系数、k因子(Bending factor and K factor).doc
- 抚州公交路线(Fuzhou bus route).doc
- 抗菌药的合理使用(Rational use of antibacterial drugs).doc
- 折返镜头(mirror lens).doc
- 抗感染药物使用基本原则(Basic principles for the use of anti infective agents).doc
- 2026及未来5年中国电磁铁行业市场发展监测及投资战略咨询报告.docx
- 2026及未来5年中国建筑工程机械行业市场发展监测及投资战略规划报告.docx
- 2026及未来5年中国硫化镍行业市场调研分析及投资战略规划报告.docx
- 2026及未来5年中国烷化剂市场运营态势及发展前景预测报告.docx
- 2026年涤纶细旦长丝项目可行性研究报告(市场数据调查、监测研究).docx
- 2026年弓型虫抗体试剂项目可行性研究报告(市场数据调查、监测研究).docx
- 2026年拖链系统用高柔性数据传输电缆项目可行性研究报告(市场数据调查、监测研究).docx
- 2025年中国水晶圆盘市场调查研究报告.docx
- 2025年中国长网双辊挤浆机市场调查研究报告.docx
- 2026年及未来5年内中国液体氩气行业投资前景及策略咨询研究报告.docx
最近下载
- 储能政策与法规研究.pptx VIP
- 钢筋混凝土框架结构施工组织设计方案.doc VIP
- 以我身份证在银行帮别人贷款协议书8篇.docx VIP
- 钢筋混凝土框架结构施工组织设计方案.docx VIP
- 2025年烟台汽车工程职业学院高职单招数学历年(2016-2024)频考点试题含答案解析.docx
- 第一单元第2课《多样的中国民间美术》教学设计 人美版2025初中美术七年级下册.docx VIP
- 河南省天一大联考英语.doc VIP
- 工程建设-钢筋混凝土框架结构施工组织设计方案.doc VIP
- 2025春初中毕业生学业考试指导书历史教材梳理答案.pdf VIP
- 农业生态学 第一章.ppt VIP
原创力文档

文档评论(0)