桥梁工程(Bridge Engineering).docVIP

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
桥梁工程(Bridge Engineering)

桥梁工程(Bridge Engineering) All kinds of standing type structure: 5 energy bar, Bailey beam, 64 type military beam, etc. All kinds of lifting equipment: Jack, crane and so on Concrete construction equipment: mixer, conveying pump, vibrating equipment, etc. Prestressed construction equipment: anchor, tensioning jack 2, cable crane: from the main cable, antenna pulley, hoisting cable, cable, hoisting and traction winch, anchor cable, tower, wind cable, cable pulley, electric hoist, hand winch, chain pulley and pulley of various components 3, bag cofferdam is generally applicable to the water depth is less than 3m, the velocity is not greater than 1.5m/s., less soil water seepage bed 4, the main contents of the base test include checking the plane position, size, elevation of the base, whether the geological conditions and carrying capacity of the base are consistent with the design data, and the treatment and drainage of the foundation 5, substrate processing The basement strata: for weathered rock, rock surface should be clean, tilt rock formation and chipping or hewn steps for weathered rock, weathered rock should be based on the size of chiseling surface rock weathered II gravel or sand layer substrate: bearing surface should be repaired and smooth Cohesive soil base: when the basement is renovated, it should be leveled under natural conditions, and shall not be compacted with backfill to keep the original structure of the natural ground The spring: spring can be blocked or method of drainage treatment, not to be immersed in water based 6, using the method of pouring underwater concrete catheter problems of catheter examination assembly, ball plug should be through the experiment to make concrete has good fluidity and coarse aggregate size from 2~3cm is appropriate, collapsbillity 18~20cm must ensure that the concrete pouring work flow radius of the continuity of the underwater, mainly has the quality of concrete head, size, perfusion area size, determinants of basal

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档