- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
船舶消防演习程序(Ship fire drill procedure)
船舶消防演习程序(Ship fire drill procedure)
The procedures for fire drills are as follows:
I. Principles of ship fire protection:
The crew shall, wherever they may find fire or smoke at any place, first use the fire fighting equipment and equipment near the site to extinguish the fire. At the same time, sound the fire alarm nearby and shout for warning to the bridge and all the crew.
IMO the international maritime organization, as stipulated in the SOLAS convention, shall include every fire drill:
1. call the crew up to the fire station;
2. report to fire station and prepare to perform the responsibilities in the contingency deployment schedule;
3. wear fireman equipment;
4. operate fire door and fire damper;
5. operate fire pumps and fire fighting equipment;
6. operate communication equipment, emergency signal and general alarm;
7. operating fire detection system, as well as;
8. teach shipboard fire fighting equipment and water spray and sprinkler systems, such as societies.
Two: engine room fire drills procedures
The captain is commander in chief of the fire drill.
Chief engineer is on-site command of engine room fire drill.
1. alarm:
1.1 ship fire commander (captain) in the cab cabin fire alarm is sounded: short sound even put in a minute, and then four long sound or on board, cable broadcasting directly to the crew cabin where transmission of fire information.
2. hear engine fire alarm action:
2.1, the General Commander, on-site command, walkie talkie (set on the fixed channel), into the post.
The 2.2 crew (including: Dress hats and gloves, wear uniform coveralls, shoes, towels, neck lines carry individual responsible for fire fighting equipment, tools, oxygen sensor, medical stretcher, shore connection box, etc.), running and shouting fire in the cabin, the alarm stops,, after two minutes to arrive at the location (each ship is lined up according to the characteristics of the selected ship in the cabin near the entrance to spacious place).
2.3 personnel arrived, on-sit
您可能关注的文档
- 脑功能定位学说对中学物理教学的启示(The Enlightenment of the theory of brain function orientation on Physics Teaching in middle school).doc
- 脑卒中内科用药干预规范(Stroke, internal medicine, intervention, standard).doc
- 能躲避障碍物的小车制作过程(The manufacturing process of a car that avoids obstacles).doc
- 脑卒中患者吞咽功能的初步研究——基于电视x线吞咽功能检查(A preliminary study of swallowing function in patients with stroke -- Based on the examination of TV and X-ray swallowing function).doc
- 脑出血急性期药物加康复治疗的疗效观察(Observation of curative effect of acute cerebral hemorrhage treated with drugs and rehabilitation).doc
- 脊椎骨转移瘤的mri诊断(MRI diagnosis of spinal metastases).doc
- 脑卒中筛查与防治基地检查表(Checklist for stroke screening and Prevention Base).doc
- 脑 筋 急 转 弯(Brain twists).doc
- 脑垂体(Pituitary gland).doc
- 脑梗塞实景案例分析(Real case analysis of cerebral infarction).doc
文档评论(0)