卫浴设备安装施工及质量评定(Installation, construction and quality evaluation of bathroom equipment).docVIP
- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
卫浴设备安装施工及质量评定(Installation, construction and quality evaluation of bathroom equipment)
卫浴设备安装施工及质量评定(Installation, construction and quality evaluation of bathroom equipment)
Installation, construction and quality evaluation of bathroom equipment
Installation, construction and quality evaluation of bathroom equipment
1, washbasin installation method
Install pipe rack, wash basin, according to the center of the nozzle to draw water from the ground to the vertical line, on the amount of provisions
Height, draw a line across the wall, mark the wall according to the width of the basin, and place a depth of 120mm in diameter
Hole. Water is used to scour debris and other debris in the tunnel. The expansion bolt is inserted into the hole and twisted with cement
Hang pot pipe fittings, rubber gasket, bolt circles, with nut is screwed to the appropriate degree of pipe end
More than the basin fixing hole. Place the basin on the rack and level the bolts with a diameter of 4mm
The upper end of the utility model is inserted into the fixing hole, and the lower end is inserted into the pipe hole, and the nut is screwed into the fitting hole
Check.
Launching connection. The basin and direct trap water connection, the first thread in the basin water outlet end
Put a little oil lead, wrapped twine, the sewage pipe is screwed on the water outlet section, snug fit. Save the water again
The lower end of the bent joint is wrapped with a whetstone and the cotton rope is inserted into the water inlet, and the rubber pad is placed at the connection point of the water retaining bend
The mother hand tighten, and then Higuchi Sako put the nut to a snug fit, straightening is used after the putty
The pipe stopper is tightly smoothed. The basin and eight trap water connected to water outlet in the basin under the first thread
End with lead oil, a small amount of water will be wrapped around the twine, riser section is screwed on the water outlet, then the cross section according to the trap
The length should be well matched, and the nut and the protecting mouth will be back to back
您可能关注的文档
- 乐山好吃的(It's delicious in Leshan).doc
- 乐队简介(Band profiles).doc
- 主持互动游戏1(Play interactive games 1).doc
- 九号台风‘梅花’muifa与天气有关的词汇及习语(Typhoon nine plum blossom Muifa weather related words and idioms).doc
- 主持感悟作品新品招商会原来可以这样开(Presided over the perception of new works, investment will be able to open this way).doc
- 乔布斯影响我一生的三个故事(Jobs three stories that influenced my whole life).doc
- 乔布斯经典名言(Jobs Classic Quotes).doc
- 乙酰氯(Acetyl chloride).doc
- 主持词(Presiding word).doc
- 九年级(初三)复习课生物教案7下消化吸收(Grade nine (third) review lesson biology lesson 7, digestion and absorption).doc
- 印刷出版物版面设计须知!(Layout of printed publications!).doc
- 卡西龙——娱乐营销创造品牌魅力(Kaxilong - entertainment marketing to create brand charm).doc
- 印刷培训教程(Printing training course).doc
- 印度孟买十里洋场石窟艺术七日游(India Mumbai three Grotto Art Tour seven).doc
- 印刷工艺中的上光和压光工艺(Glazing and calendering process in printing process).doc
- 南澳街道办应急演练推演词及解说词(Nan'ao Street emergency drills deduction words and commentary).doc
- 历博(Li Bo).doc
- 历史版本(History version).doc
- 历史练习题(History exercises).doc
- 历史科学的基础理论 - 文科综合 - 未来北大人社区(The basic theory of historical science - Liberal Arts synthesis - future North adult community).doc
原创力文档


文档评论(0)