粉喷桩(Powder jet pile).docVIP

  • 2
  • 0
  • 约1.82万字
  • 约 14页
  • 2017-10-07 发布于河南
  • 举报
粉喷桩(Powder jet pile)

粉喷桩(Powder jet pile) Design method and construction quality management of soft foundation treated with powder jet pile Abstract: This article in view of the current engineering practice of expressway construction in our province a lot by spray powder pile in soft soil foundation, from the two aspects of design method and construction quality management describes the effective measures to guarantee the DJM pile, in order to improve the level of the design and construction of our province soft soil foundation treated with cement injection pile. Key words: expressway; soft foundation treatment; powder injection pile; design and construction Since I am located in the water network area between the coast, along the Yangtze River and the Huaihe River, from the more than 1000 km expressway built and under construction, the subgrade of 70% to 80% above all passes through the soft soil area. The soft foundation treatment is good or bad, directly affects the stability of the subgrade, the overall engineering operation quality and the economy of the project. At present, the main treatment methods of soft foundation are as follows: plastic drainage plate; mixing pile (powder spraying pile and deep mixing pile); geosynthetics reinforced; and (ultra) preload. In contrast, the powder spray pile has short period, the settlement characteristics of small construction period and preloading, is widely used in soft foundation treatment of Expressway in our province, for example, was built in the Jiangsu section of Shanghai Nanjing Expressway, powder spraying pile in soft foundation treatment project amounted to millions of meters, is the construction of the Jiangsu 95 the highway also uses DJM about ten million linear meters, and most of them have been completed. Design method and points for attention of 1 powder jet pile 1.1 design standards 1.1.1 reference period and allowable post construction settlement The flexible pavement design life for 15 years, according to the usual practice

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档