- 40
- 0
- 约1.56万字
- 约 17页
- 2017-10-06 发布于河南
- 举报
巨人通力(GiantKONE)
巨人通力(GiantKONE)
0001 running monitoring time is beyond the time defined within the software,
The position of the car has not changed. Reboot required
0003 speed exceeding the rated speed 110%.
Under repair condition, the speed is greater than 0.66m/s automatically (after the elevator stops)
0004 there are errors in the operation of three consecutive simultaneous correction operations. The system has not found 77:U/N, 61:U/N, and 30 signals after 3 consecutive simultaneous correction operations. Reboot required
0007 door switch 30 or B30 sticky gate area signal continuous effective, need to res
您可能关注的文档
- 定焦与恒定光圈的好处(The benefits of fixed focus and constant aperture).doc
- 定律与简便计算(Law and simple calculation).doc
- 定语从句专项训练(Specific training for attributive clauses).doc
- 定语从句的翻译技巧(Translation skills of attributive clauses).doc
- 定律大全(The complete book of laws).doc
- 宜家的沟通之道(IKEA's communication).doc
- 定语从句 易错选择题系列(The attributive clause error prone choice series).doc
- 定额材料汇总(Summary of quota materials).doc
- 宝宝长高(Baby taller).doc
- 宝成铁路列车坠桥质疑 铁路部门责任不能坠落!(Baoji Chengdu railway train bridge questioned the railway sector responsibility cannot fall!).doc
原创力文档

文档评论(0)