- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建筑工程施工测量方案(Construction project survey plan)
建筑工程施工测量方案(Construction project survey plan)
Construction project survey plan
Time: 2011-5-22 21:44:15 Click: 621
Core tip: (excerpt from the prestressed, basement waterproofing membrane and construction works construction survey plan in the measurement content for reference A check, starting basis, building control network based on the positioning measurement before starting 1. check, Party A shall provide the coordinates of the control points of three clothesbrush interconnected, and two elevation control points, as the field control based on point. Take the coordinate control point as the starting point. Two level traverse survey is used as building plane control network. ...
(excerpt from the measurement content in the construction plan for construction of prestressed concrete basement waterproofing membrane and construction works, for reference)
First, check the basis of the start, the establishment of building control network
1. check the starting basis
Party A shall provide positioning before measuring, control point coordinates three clothesbrush interconnected, and two elevation control points, as the field control based on point. Take the coordinate control point as the starting point. Two level traverse survey is used as building plane control network. On the basis of elevation control points, the level of leveling is measured and the elevation is measured to the field area.
The plane control network accuracy of wire not less than 1/10000, elevation control survey closure error no greater than 30 V L mm (L for connecting route length to km).
When building a building control network, the starting point should be checked. According to the coordinates of the buildings corner points on the red line pile and the drawings, the relative relation between them is calculated and the angle and distance calibration is carried out. Calibration error: the angle is + 12; the relative accuracy of the distance is not less than 1/15000.
The initial elevation point applicat
您可能关注的文档
- 尴尬的红酒营销(Embarrassing red wine marketing).doc
- 就李昌奎案与车浩博士再商榷(Discuss Dr. Li Changkui's case with Dr. Hao Hao).doc
- 就业指导考试部分问题答案(Part of the questions about the employment guidance test).doc
- 尼龙(nylon).doc
- 局域网ping不通原因(Lan Ping blocked reason).doc
- 局域网ping不通的原因(The reason why Lan Ping is blocked).doc
- 尚丰五步棋打造金牌营销团队(Shang Feng five moves to create the gold marketing team).doc
- 局域网不能访问共享问题(LAN does not access shared problems).doc
- 尼龙简介及特性(Introduction and characteristics of nylon).doc
- 尽显华夏风景教你风光摄影拍摄技巧(Show Chinese scenery, teach you scenery photography skills).doc
- 建筑常识1(Architectural knowledge 1).doc
- 建立高效能的劳动力队伍白皮书(Establish a white paper on efficient workforce).doc
- 建筑弱电工程师习题(Building weak engineer problem).doc
- 建筑新人们搞不懂的小问题汇总(A collection of small problems that new people do not understand).doc
- 建筑施工与监理(建筑安全基本知识)(Building construction and supervision (basic knowledge of building safety)).doc
- 建筑施工技术面试(Construction technology interview).doc
- 建筑施工现场安全文明施工管理资料的做法说明及参考方法8(Construction site safety and civilized construction management data description and reference methods 8).doc
- 建筑术语(Architectural terminology).doc
- 建筑施工组织概论(Introduction to construction organization).doc
- 建筑方案eddy五步法(Construction plan eddy five step method).doc
原创力文档


文档评论(0)