网站大量收购独家精品文档,联系QQ:2885784924

小区服务中心楼施工图预算-毕业设计.docVIP

小区服务中心楼施工图预算-毕业设计.doc

  1. 1、本文档共31页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
小区服务中心楼施工图预算-毕业设计

郑州航空工业管理学院 本科生毕业论文(设计) 郑州市裕华小区服务中心楼施工图预算 姓  名   号 专  业 指导教师 年月4,268,914.63元,单方造价为1322.71元/m2。 关键词: Abstract 朗读 显示对应的拉丁字符的拼音 This design is a service center building construction drawing budget, and the building is in Zhengzhou. This project is a four-story office building and the design working life is 50 years, and seismic fortification intensity is seven degrees and the structural type is frame structure system. The total construction area is 3227.4㎡. The building of this project counts four layers and are on the ground. The height of the first floor is 4.2m, two layers of high 3.6m, high 3.6m three layers, four layers of high of 3.63m. The building eaves height above ground is 15.000m and the underlying type is an independent foundation. The roofing waterproofing rank is second-level and the building fireproof rank is second-level. This design develops a set of construction?drawing?budget?books in according with the consolidated?unit?price?of?engineering?quantity?list?of?construction?engineering?in?Henan?province?(2008), which is based on a service center located in Zhengzhou city of Henan province and building construction drawing as well as follows the program of construction drawing budget books. First of all, the author does the construction quantities according to the order of the fixed project. At the same time the author does the comprehensive unit conversion adopting the soft of Guang Lian Da GBQ4.0; the author regulates the difference of prices according to the building price provided by 4th quarter of 2014 in Zhengzhou. The design charges the reasonable price according to the standard price. Finally, the author makes the construction drawing budget by forming all the materials. The design?finally?formed?a?complete?construction?drawing?budget, which include the engineering cost index summary talent and machine summary table. The project cost is about 4,268,914.63 yuan, and unilateral?cost?is?1322.71 yuan per squre meter. Keywords: Cons

您可能关注的文档

文档评论(0)

zhengshumian + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档