- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
测绘工程英文论文
Reduction of Short-Interval GPS Data for Construction Operations Analysis
John Hildreth, M.ASCE1; Michael Vorster, M.ASCE2; and Julio Martinez, M.ASCE3
Abstract: The systems that historically have been used to collect data for time studies of construction operations are manual in nature and limited to the observers field of view. Global Positioning System (GPS) technology incorporated into an onboard instrumentation system can be used to autonomously collect position and velocity data without the field of view limitation. Data must be collected at a short time interval to provide the level of detail necessary for operations analysis. Thus the issue becomes managing the data and identifying the relatively key records that mark the start and stop of activities. A field observer identifies the key times in real time with
instantaneous decisions of when one activity stops and the next starts based on enormous volumes of visual information. This work developed a methodology for making equivalent decisions based on GPS data and presents the procedures developed to identify the key records necessary to calculate activity durations. A case study is used to illustrate application of the system to an earthmoving operation.
Also, it is postulated how the information can be used in discrete event simulation.
DOI: 10.1061/(ASCE)0733-9364(2005)131:8(920)
CE Database subject headings: Geographic information systems; Construction industry; Data analysis; Information management;Time studies.
Introduction
Time studies historically have been performed to record the time required to complete various construction tasks (Oglesby et al.1989). The original time study system was the stopwatch, which has since been replaced by time-lapse video recordings. These systems are manual in nature and limited to the field of view of the observer, or what is within the line of sight of the observer.Recently, analysts have turned to technology for new tools.Whether an observe
您可能关注的文档
- 注射剂车间的设计严格按GMP规定设计.doc
- 注射用异环磷酰胺说明书.doc
- 注意看题干.doc
- 注塑机螺杆设计参考资料.ppt
- 注射液可见异物讨论.doc
- 泰康人寿保险公司XX分公司个险事业部2012开门红方案宣导模板课件演示文档幻灯片资料.ppt
- 泰国与东南亚国家打招呼方式的差异.doc
- 泰康人寿保险 新兵训练营销售流程.ppt
- 泵房沉井施工组织方案.doc
- 泰锋电器 希尔媒体推荐案.ppt
- 国际标准 IEC 60670-23:2006 EN-FR 家用和类似固定电气安装用电器配件的盒子与封闭装置——第23部分:地板箱和封闭装置的要求 Boxes and enclosures for electrical accessories for household and similar fixed electrical installations - Part 23: Particular requirements for floor boxes and enclosures.pdf
- 2024版完整的货物运输合同书.doc
- 2024版无财产的离婚协议书书模板.doc
- 2024版委托融资租赁合同书书.doc
- 2024版汪怡的离婚协议书书.doc
- 2024版委托活动代理服务协议书书.doc
- 2024版挖掘机租赁合同书范本最新.doc
- 2024版退款协议书书.doc
- 2024版维修服务合同书范本.doc
- 2024版文化艺术品买卖服务合同书.doc
最近下载
- 2022-2023学年湖北省鄂州市七年级下学期期末数学试卷(含答案解析).docx
- 成都市七中育才学校初一新生分班(摸底)语文考试模拟试卷(10套试卷带答案解析).pdf VIP
- 玄隐遗密(含黄帝内经).docx
- 幼儿园区域环境—语言区环境创设(幼儿园环境创设课件).pptx VIP
- 整体租赁底商运营方案(技术方案).docx
- 脑梗塞后遗症病人护理查房ppt课件.pptx
- 【上海市】医疗服务收费标准.pdf
- 灭菌方法和无菌操作.ppt
- 华中农业大学2020-2021学年《植物生理学》期末考试试卷(A卷)含参考答案.docx
- 华中农业大学2021-2022学年《植物生理学》期末考试试卷(A卷)含参考答案.docx
文档评论(0)