- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Operation of the Defense Acquisition System[国防采办系统的运作](PPT-79)
* The blue bold items in italics highlight the emphasis on systems engineering in technology development. Competitive Prototyping: Two or more competing teams producing prototypes of the system and/or key system elements. RAM Strategy: Reliability, Availability, and Maintainability strategy that includes a reliability growth program is documented in the SEP, in the LCSP, and assessed during tech reviews, TE and Program Support Reviews. Guided by: Although not stated in 5000.02, the “performance goals” in the TDS should reflect AoA results that support the materiel solution (approved at MS A). The user may also prepare a draft CDD before or shortly after MS A. Performance attributes are needed for the TD contract. Preliminary Design Review (PDR). -A PDR will be conducted for the candidate design(s) to establish the allocated baseline (hardware, software, human/support systems) and underlying architectures and to define a high-confidence design. -A successful PDR informs requirements trades; improves cost estimates; and identifies remaining design, integration, and manufacturing risks. -The PDR will be conducted at the system level and include user representatives and associated certification authorities. -A PDR Report is provided to the MDA at Milestone B and includes recommended requirements trades based upon an assessment of cost, schedule, and performance risk. -Note: The CDD KPPs and other performance attributes should reflect the trades from the PDR report; however, the CDD must be approved before MS B. The requirements trades recommended at MS B could be the “derived” technical requirements, not sure. * Program Initiation (not “new start”). Effort was a new start in PPBE when funding for EMD phase was requested in the President’s budget – year of more in advance of MS B) -Important: at MS B PM must demonstrate “full funding” in FYDP – i.e., at least 6 years of funding. -PM was probably assigned prior to MS A – need someone in charge to get ready
原创力文档


文档评论(0)