预制品生产批量与支付进度集成优化问题分析-analysis of integrated optimization problem of batch production and payment schedule of pre-manufactured products.docxVIP

  • 2
  • 0
  • 约4.32万字
  • 约 65页
  • 2018-06-05 发布于上海
  • 举报

预制品生产批量与支付进度集成优化问题分析-analysis of integrated optimization problem of batch production and payment schedule of pre-manufactured products.docx

预制品生产批量与支付进度集成优化问题分析-analysis of integrated optimization problem of batch production and payment schedule of pre-manufactured products

AbstractIn recent years, the companies which produce prefabricated parts enjoy swift growth, but the majority of them are stuck in inefficient management. It is a complicated systems engineering to manage the companies for their daily operations. Whether managers can make production schedule plan and payment schedule plan efficiently, according to the companies’ internal and external conditions, makes great effects on their competitiveness and survival ability development.The study has conducted in the environment of contractor - prefabricated part producer - raw material supplier construction supply chain. In this kind of construction supply chain, each member is responsible to pay its upper members for their service. Payment schedule plan makes great effect on the capital held by prefabricated part producer, then influences the production plan and procurement plan. In this thesis, the integrated optimization model for lot-sizing plan and payment schedule of prefabricated parts has been established, after the properties of logistics, cash flow and information flow have been analyzed deeply. The model is related with many research fields, such as lot-sizing plan, payment schedule optimization, construction supply chain, and so on. It can support managers to make integrated scheduling plan including payment schedule, production plan and raw material procurement plan. The relationship between the net present value of profit and the parameters in production and payment activities has been analyzed, both in single-level-payment pattern and two-level-payment pattern. Then based on the achievement above, production optimization rules and payment schedule plan negotiating guidance have been summarized.By the analysis of production case, It has proved that the integrated optimization model can make efficient production operation and increase the net present value of production profit.Keywords: Prefabricated Parts, Production Lot-sizing Plan, Payment Schedule, Integrated Opt

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档