交工及缺陷责任期的监理( completion and supervision of the defects liability period).docVIP

交工及缺陷责任期的监理( completion and supervision of the defects liability period).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
交工及缺陷责任期的监理( completion and supervision of the defects liability period).doc

08 交工及缺陷责任期的监理(08 completion and supervision of the defects liability period) 8 completion and supervision of the defects liability period 8.1 completion and handover certificate Type 8.1.1 completion certificate Handover certificate of 8.1.1.1 contract project All the works within the scope of the contract have been basically completed. The engineer received the Contractors handover application report, and after a thorough examination of the project, it meets the requirements of the contract documents, the Contractor shall timely handover certificate issued to all engineering. If it does not meet the requirements of the contract document, the supervising engineer shall specify in writing what work the Contractor shall complete. Part of the 8.1.1.2 project handover certificate The supervision engineer in accordance with the principles of 8.1.1.1, the following can be part of the project handover certificate issued to the contractor; (1) any major part of the project has been completed and can be delivered independently, (2) any part of different duration of the project completion stipulated in the contract; (3) any project occupied or used by the owner. Necessary conditions for the handover certificate issued by 8.1.2 8.1.2.1 contractors written application The date of receipt of the Contractors supervision engineer application report. The 8.1.2.2 project is indeed completed The whole project construction supervision engineer to the contractor for the completion of the part or to conduct a comprehensive inspection, confirmed the main project has been completed, the remaining projects are few, the completion of these projects during the defects liability period, does not affect the normal use and traffic and construction safety. 8.1.2.3 engineering inspection qualified (1) the result of engineering quality inspection by the supervision engineer proves that the project is in conformity with the requirements of the specification and the data are complete. (2) all kind

文档评论(0)

zhangningclb + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档