工程-建设标准强制性条文CPECSB3房屋建筑部分(英文版).docVIP

工程-建设标准强制性条文CPECSB3房屋建筑部分(英文版).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
工程-建设标准强制性条文CPECSB3房屋建筑部分(英文版)

PAGE — PAGE 6 — Section III Building Equipment 1. Water Supply and Drainage Equipment 1.1 Piping Arrangement Architectural Design Specification for Library JGJ 38-99 7.1.2 Water distribution point shall not be provided in stacks in libraries. Piping for water supply and drainage shall not pass through stacks. Vertical sewage pipe shall not be installed in interior walls neighboring stacks. Architectural Design Specification for Archives JGJ 25-86 6.1.2 Water using point shall not be arranged in warehouse area of archives gallery and piping for water supply and drainage shall not pass through warehouse area of archives gallery. Design Specification for Architectural Water Supply and Drainage GBJ 15-88 2.4.2 Water supply piping shall not be arranged above raw materials, products or equipment which will burn or explode in contacting with water. 3.3.7 Drainage pipe shall not be arranged above raw materials, products or equipment, which will be burnt or explosive in contacting with water. 3.3.9 Drainage pipe shall not be arranged above dining rooms, operating and cooking rooms for main food or non-staple food in eating establishments. In case due to condition limitation it is unavoidable, protection measures shall be taken. Design Specification for People’s Air Defense Basement GB 50038-94 6.1.15 When water supply piping for air defense basement is introduced from entry or exit, blast wave proof valves shall be provided inside the protection sealing doors. If they are introduced from the guard protection structures, blast wave proof valves shall be provided to the inside of exterior walls or inside of ceilings. The force of resistance shall not be less than 1Mpa. 6.2.11 In case the vent pipe is necessary to pass through the guard protection structure of sir defense basement, valve with nominal pressure not less than 1MPa shall be provided to its inside. 6.2.16 Blast wave proof valves with nominal pressure not less than 1MPa shall be provided to the inside of the pl

文档评论(0)

feixiang2017 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档