基于双层粒子群优化算法柔性作业车间调度优化.docVIP

基于双层粒子群优化算法柔性作业车间调度优化.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
基于双层粒子群优化算法柔性作业车间调度优化

基于双层粒子群优化算法柔性作业车间调度优化   摘要:针对柔性作业车间调度问题(FJSP),提出了一种改进的双层粒子群优化(ITLPSO)算法。首先,以机器的最大完工时间最小化为优化目标,建立了一个柔性作业车间调度模型;然后,介绍了改进的双层PSO算法,为了避免陷入局部最优和提高收敛速度,算法中加入了停滞阻止策略和凹函数递减策略;最后,对相关实例进行求解,并与已有算法作了比较。实验结果表明,与标准PSO算法和双层粒子群优化(TLPSO)算法相比,最大完工时间的最优值分别减少了11和6,最大完工时间的平均值分别减少了15.7和4,收敛速度明显提高。经过性能分析,所提算法可以明显提高柔性作业车间的调度效率,从而获得了更优的调度方案。   关键词:柔性作业车间;双层粒子群优化算法;调度优化;凹函数递减策略;停滞阻止策略   中图分类号: TP301.6; TP18 文献标志码:A   Abstract: To deal with the Flexible Jobshop Scheduling Problem (FJSP), an Improved TwoLayer Particle Swarm Optimization (ITLPSO) algorithm was proposed. First, minimization of the maximal completion time of all machines was taken as the optimization objective to establish a flexible jobshop scheduling model. And then the improved twolayer PSO algorithm was presented, in which the stagnation prevention strategy and concave function decreasing strategy were adopted to avoid falling into local optimum and to improve the convergence rate. Finally, the proposed algorithm was adopted to solve the relevant instance and the comparison with existing methods was also performed. The experimental results showed that, compared with the standard PSO algorithm and the TwoLayer Particle Swarm Optimization (TLPSO) algorithm, the optimal value of the maximum completion time was reduced by 11 and 6 respectively, the average maximum completion time was reduced by 15.7 and 4 respectively, and the convergence rate was improved obviously. The performance analysis shows that the proposed algorithm can improve the efficiency of the flexible jobshop scheduling obviously and obtain better scheduling solution.   Key words: flexible jobshop; TwoLayer Particle Swarm Optimization (TLPSO) algorithm; scheduling optimization; concave function decreasing strategy; stagnation preventive strategy   0 引言   作业车间调度问题(Jobshop Scheduling Problem, JSP)研究多个工件在多台机器上的加工分配问题,JSP的目的是为每台机器找到合适的加工工序使性能指标最优[1]。JSP的典型性能指标是完工时间,即完成所有工件加工所需要的时间。Bucker等[2]在前人研究的基础上提出了柔性作业车间调度问题(Flexible Jobshop Scheduling Problem,FJSP),并给出了求

文档评论(0)

3471161553 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档