综放大坡度仰斜开采及围岩控制技术分析-analysis of fully mechanized enlarged slope inclined mining and surrounding rock control technology.docxVIP

综放大坡度仰斜开采及围岩控制技术分析-analysis of fully mechanized enlarged slope inclined mining and surrounding rock control technology.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
综放大坡度仰斜开采及围岩控制技术分析-analysis of fully mechanized enlarged slope inclined mining and surrounding rock control technology

论文题目:综放大坡度仰斜开采及围岩控制技术研究 专 业:建筑与土木工程 硕 士 生:徐学富 (签名) 指导教师:惠兴田 (签名) 摘 要 红会四矿是靖远煤业集团公司的一个老矿井,开采特厚煤层,煤质优良。目前矿井 剩余可采资源量多数煤层倾角都在 20°以上,部分达到 35°左右,而且煤层走向变化 大,地质构造多,必需采用倾斜长壁综放大坡度仰斜开采,使得部分综放工作面的仰采 坡度超过了 30°,综放工作面的仰采坡度大大超过了一般认为的仰采坡度上限,严重影 响着矿井的安全高效和正常生产。 本文在对红会四矿大倾角特厚煤层倾斜长壁综放开采现场状况调查的基础上,系统 分析了其综放工作面大坡度仰斜开采的基本特点。对大坡度仰斜开采综放工作面支架围 岩系统稳定性特征、以及大坡度仰斜开采综放工作面煤壁片帮形式进行了分析,采用数 字模拟方法分析了大坡度仰采综放面煤壁应力的分布特征及其对片帮冒顶的影响作用, 在此基础上,提出了综放工作面大坡度仰斜开采时的顶板和煤壁控制技术措施,并进行 了现场试验和应用。现场工程实践表明,提出的顶板和煤壁控制技术措施有效改善了大 坡度仰斜开采综放面的支架围岩稳定性,现场试验取得了良好的技术经济效果。 关 键 词:大坡度;仰斜开采;综放;围岩 研究类型:应用研究 Subject : Study on Mining and Rock Control Technology in Rise Mining Full Mechanized Caving with Large Slope Specialty : Mining Engineering Name : Xu Xue-fu (Signature) Instructor: Hui Xing-tian (Signature) Abstract Coal mine No.4 of Hong Hui in JingYuan Coal Industry Group Mine is an old mine, mining thick coal seam, coal quality,mine is currently the majority of remaining recoverable coal resources are in the 20 ° angle above, partly to reach 35 ° or so, and coal seam changes, geological structure and more, it is necessary to enlarge the great slope of longwall mining inclined to make part of the mining face the rise mining slope more than 30 °, mining face rise mining slope much higher than is generally believed that the rise mining slope limit, a serious impact on the mine and the normal production of safe and efficient. This subject in the coal mine No.4 inclined thick coal seam longwall caving on the basis of field tested, the system analyzes its mining face great slope overhand mining the basic characteristics.Tilting on the large slope mining mining face rock caving system stability characteristics, and the great slope overhand mining coal caving face in the form of rib fall analysis, digital simulation analysis of a large slope rise mining mining face coal wall stress distribution and its impact on the role of fall roof, on this basis, the proposed inclined thick coal seam longwall mining face large slope overhand m

您可能关注的文档

文档评论(0)

peili2018 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档