sqe–supplierqualityengineersu:SQE供应商质量engineersu–.docVIP

sqe–supplierqualityengineersu:SQE供应商质量engineersu–.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
sqe–supplierqualityengineersu:SQE供应商质量engineersu–.doc

e? AllisonTransmissionDRIVING TRANSMISSION TECHNOLOGY e? Allison Transmission DRIVING TRANSMISSION TECHNOLOGY, Problem Solving Form(AT-1018I-1) Note: Use form AT-10181-1 for Non-SQN data or if ITAR data must be included PURPOSE: The purpose of the Problem Solving Summary Form AT-10180 is to provide instructions on how to properly fill out an 8-Step. SCOPE: The Problem Solving Summary Form AT-10180 applies to quality notifications requiring an 8-Step. DEFINITIONS: SQE - Supplier Quality Engineer SQN - SAP Quality Notification OEM - Original Equipment Manufacturer Owner - Internal Person, Supplier Representative, or assignee Responsible to Answer Quality Notification ITAR - International Traffic in Arms Regulations PM - Preventative Maintenance BOB - Best of the Best WOW - Worst of the Worst PFMEA- Failure Mode and Effects Analysis RPN - Risk Priority Number N/A - Not Applicable N/C - No Change GVC - Graphical Verification Check-Sheet EPSV - Error Proofing System Verification REFERENCES: ? AT-1927-84 Drill Deep Worksheet TABLE OF CONTENTS: Form Title Block Page 2 TOC \o 1-5 \h \z Step 1 Page 3 Step 2 Page 3 Step 3 Page 4 Step 4 Page 4 Step 5 Page 5 Step 6 Page 6 Step 7 Page 6 Step 8 Page 7 Box A1 must be marked/checked ifand only if ITAR data is included on the form. Do not check box A1 if no ITAR data is included. Form Title Block Person Responsible: Administrator, Plant SQE, or assignee This section refers to the title block within the printed 8-Step. These are defined when the SQN is opened. Title:Short description of problem Opened by: SQN Administrator, Plant SQE, or assignee Owner: Internal Person, Supplier Representative, or assignee Responsible to Answer Quality Notification Tracking #: SQN Number Date Opened: Date SQN started in management system Date Closed: Date SQN closed in management system Originating Plant: Plant initiating SQN Where Found:lnternal/Externallocation where problem found (May not be same as Originating Plant) MateriahPart Number Material

文档评论(0)

ggkkppp + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档